Action ID Done Deadline Meeting Description Responsible
172 MPP-218 Review the inconsistency that the WIC will not interlock the beam in case of a power converter failure, but still interlock the beam in case of a magnet failure PSB
  • G.P. Di Giovanni
  • MPP
  • D. Nisbet
166 MPP-213 Study necessity and feasibility of special interlock configuration for LINAC4 3 MeV runs Linac4
  • P. Skowronski
165 MPP-213 Initiate study of alternative interlock configuration and failure diagnostics for Linac4 and possibly other injectors Linac4
  • P. Skowronski
163 MPP-213 Update BIS specification (page 2) clarifying present and future situation wrt RF actuator Linac4PSB
  • C. Martin
174 MPP-208 Draft a procedure for the tracking of the bypassed equipment PSB
  • J. Uythoven
173 MPP-208 Organize a meeting between OP and the MPE SW team to define the specifications for an improved GUI PSB
  • B. Mikulec
121 MPP-201 Implement additional software threshold for maximum losses during the slow extraction SPS
  • M. Fraser
  • V. Kain
118 MPP-201 Prepare and organize review of the SPS slow extraction system SPS
  • MPP, in collaboration with TE-ABT and BE-OP
117 MPP-200 Propose how to protect the CTRB interface of the BLMs to the timing system against accidental changes and overwriting via FESA, in collaboration with the timing team Linac4PSBPS
  • S. Jackson
  • J. Uythoven
115 MPP-197 Organize a discussion on the BIS GUI for the injectors PSB
  • J. Uythoven
113 MPP-197 Verify how the connection has been done between POPS-B and BIS and describe the user input to BIS PSB
  • F. Boattini
64 MPP-192 Report on the first operational experience of the SPS BLM system after LS2 SPS
  • K. Li
85 MPP-190 Study how to implement an online optics model and related configuration management depending on the optics Linac4
  • B. Mikulec
  • R. Scrivens
94 MPP-186 Evaluate if automatic checks of the internal performance of the SPS BIS systems are required SPS
  • J. Uythoven
89 MPP-186 Update specifications for the SPS and TT10 WIC with the modified MDSH connections SPS
  • R. Mompo
83 MPP-182 Define procedure under which circumstances and how to change the high-loss LINAC4 watchdog limits, including roll back to standard operation Linac4
  • A. Lombardi
80 MPP-182 Investigate and if possible implement the link between BIS and External Conditions. Otherwise, implement link via SIS Linac4
  • G. Kruk
  • B. Mikulec
128 MPP-179 Evaluate how the masking of watchdog interlocks in the SIS can be only allowed for short pulse lengths Linac4
  • B. Mikulec
74 MPP-179 Identify relevant locations and beam parameters for energy-deposition studies at LINAC4 Linac4
  • A. Lombardi
  • A. Lechner
  • B. Mikulec
73 MPP-179 Propose values for BLM hardware settings PSB
  • B. Mikulec
72 MPP-179 Evaluate if there are additional aperture bottlenecks, where damage might lead to longer downtime than required for a bellow replacement Linac4
  • A. Lombardi
71 MPP-179 Evaluate best implementation to send automatic reminders of all active SIS masks for every shift PSB
  • B. Mikulec