As the Engineering Specifications for TT10 does not yet exist, the action can be divided in two parts:
- “Update specifications for the SPS WIC with the modified MDSH connections”
- “Write specifications for the TT10 WIC, including the MDSH connections”
- Log in to post comments
Update:
Part 1 of the Action "Update specifications for the SPS WIC with the modified MDSH connections” is done:
"MDSH.11971 is physically located in the SPS ring but is connected to the WIC of TT10 as this circuit is powered at beam injection only and is included in the “User_Permit” signal sent to the BIS by the WIC system of TT10." (p. 22, https://edms.cern.ch/document/1295506/2.0)
Part 2 (Write specifications for TT10 WIC) is still pending.
- Log in to post comments
Talked to Richard. Part 2 (Write specifications for TT10 WIC) is still open.
- Log in to post comments
Email from Richard (22-FEB-2021):
Hello Christophe,
The magnet and power converter are now connected to the WIC dedicated to TT10 transfer line... and tested !
On the screenshot below, you can see that the power converter status (for this circuit only) is included in the calculation of the “User_Permit_to_BIS” sent to the BIS (solid blue square = active).
Unfortunately, TT10 is not yet documented with an appropriate Engineering Specification (but it is listed in third position on my to-do list 😉).
Cheers,
Richard