List of actions¶
Meeting | Description | Responsible | Deadline | |
---|---|---|---|---|
221 | MPP-251 |
Prepare specifications for the PM analysis module LHC | T. Levens, C. Hernalsteens, M. Gasior | |
220 | MPP-245 |
Document the interlock implementation in an ECR LHC | T. Levens | |
219 | MPP-245 |
Christoph will follow-up with Victor regarding the preparation of the checklists LHC | C. Wiesner | |
218 | MPP-244 |
BI will trigger the necessary actions with the BIS team after they deploy the latest firmware LHC | M. Gasior, BIS Team | |
217 | MPP-243 |
Verify with the FLUKA team if the TCL4-5 could be further open to benefit ARP LHC | F. Van der Veken | |
216 | MPP-242 |
Report to the MPP regarding the decision on the TSU renovation and the outcomeof the reliability analysis or the new interface between BIS and TSU LHC | N. Voumard, P. Van Trappen | |
215 | MPP-242 |
Report on the first experience with beam regarding the reduced sensitivity of the newly installed BLMs and propose the interlocking strategy for the 2024 run LHC | B. Salvachua | |
214 | MPP-240 |
CCR describing changes in LBDS remote validation feature LHC | C. Boucly, N. Magnin | |
213 | MPP-240 |
Update BCCM commissioning procedure LHC | C. Hernalsteens, M. Gasior | |
212 | MPP-240 |
ECR describing the changes in SPS SMP-BCT changes in YETS 23/24 LHC | R. Secondo, T. Levens | |
211 | MPP-239 COLLWG |
Compare expected 28 kW losses to the HiRadMat tests LHC | A. Lechner | |
210 | MPP-238 |
Validate all the collimator segments from 120cm to 60cm (and all the matchpoints in between) to ensure safe fast beta* levelling to 60cm LHC | R. Bruce | |
209 | MPP-237 |
Implement a way to limit the crossing angle change around the reference value LHC | M. Hostettler | |
208 | MPP-237 |
Share the outcome of the modifications and BIC validation with the MPP LHC | M. Milovanovic | |
207 | MPP-236 COLLWG |
Share a 3D model of the foil shape (V. Coco) and perform impedance simulations LHC | B. Salvant | |
206 | MPP-236 COLLWG |
Proposal for the post TS1 ramp-up and for the documentation of the VeLo-related checks LHC | C. Wiesner | |
205 | MPP-235 |
Prepare an ECR to document the changes LHC | T. Levens | |
204 | MPP-234 |
Define the filling schemes corresponding to each intensity step LHC | C. Wiesner, F. Moortgat | |
203 | MPP-234 |
Determine the interlock level for the TCT BPMs for the 2023 configuration LHC | BE-OP, Collimation | |
202 | MPP-234 |
Define the optics steps at which the measurements will take place and agree with OP for a slot to perform them LHC | BE-OP, C. Hernalsteens | |
201 | MPP-233 COLLWG |
Report to the MPP on the design of the new safety system LHC | TE-VSC | |
200 | MPP-233 COLLWG |
Determine limits on the loss rate that can be tolerated for local aperture measurement LHC | LHCb | |
199 | MPP-232 |
Validate collimator settings for B* levelling 2023 scenario LHC | M. Hostettler, Collimation | |
198 | MPP-232 |
Provide a proposal for checks on collimator interlock settings LHC | M. Hostettler | |
197 | MPP-232 |
Verify PM trigger of the BCCM system before making it operational LHC | M. Gasior, C. Wiesner | |
196 | MPP-232 |
MPS procedure for TOTEM (and similarly for CTPPS and ARP) LHC | M. Deile, C. Hernalsteens | |
195 | MPP-232 |
Provide a procedure to OP for FMCM triggering tests LHC | A. Antoine, J. Wenninger | |
194 | MPP-232 |
Decide if blindable BLMs should be commissioned in 2023 LHC | D. Wollmann, C. Bracco, B. Salvachua | |
193 | MPP-231 |
Draft ECR on the proposed DC-BCT and SMP changes for the SPS LHC | T. Levens, R. Secondo | |
192 | MPP-222 |
Check the aperture limits of the new BSRTM device are in accordance with Run3 parameters LHC | R. De Maria, D. Mirarchi | |
191 | MPP-222 |
Provide semi-flat functions to test 2023 Beta* levelling mechanics in 2022 without interfering with levelling LHC | M. Hostettler, D. Mirarchi | |
190 | MPP-223 |
Confirm the length of the ADT excitation window in terms of number of bunches LHC | C. Hernalsteens | |
189 | MPP-223 |
Identify and solve the BLM XPOC issue LHC | C. Zamantzas | |
188 | MPP-223 |
Report on the validation of the diode solution for the LSS3 BLMs issue LHC | C. Zamantzas | |
187 | MPP-223 |
Follow-up on the protection of settings for the SPS MKE phasing and discuss the potential impact of rolling back with LSA tags on other critical settings LHC | MPP, BE-OP | |
186 | MPP-224 COLLWG |
Follow -up on the delay of the beam dumped event sent out over the timing system LHC | G. Kruk | |
185 | MPP-224 COLLWG |
Install a BLM close to the BSRTMB in IR4 during the YETS LHC | B. Salvachua | |
184 | MPP-224 COLLWG |
Define the list of required loss maps for critical scenario LHC | BE-OP, Collimation | |
183 | MPP-224 COLLWG |
Define and organize a test with beam to confirm that the beam is not affected in case of an abort of the wire power converter during the timeframe of the interlock reaction time of the WIC and BIS LHC | BE-OP, BE-ABP | |
182 | MPP-226 |
Follow-up on the RBAC protection of the settings of machine protection equipment LHC | MPP | |
181 | MPP-227 |
Perform all BBWC tests to allow the powering of the wires during the ramp-up once the software is ready LHC | G. Sterbini | |
180 | MPP-229 |
By the end of the year inputs for potential additional interlocks or hardware stops for the protections of components in the FRAS must be provided by the relevant teams and collected for the FRAS specifications LHC | F.-X. Nury | |
179 | MPP-229 |
Prepare detailed specifications for the interlocks, including the FRAS key in CCR and the newly discussed “FRAS powering interlock” to a maskable input of the CIBUs in IR1 and 5 LHC | FRAS, MPP | |
178 | MPP-230 |
Report on the currently tested options to minimize the bunch length dependence of the BCCM signals LHC | M. Gasior | |
177 | MPP-220 |
Analyze the changes to be made in the test procedure and study the consequences LHC | L. Roy, MPP | |
176 | MPP-220 |
Provide the list of disabled BIS channels to the MPP and inform the MPP once the channels are enabled again LHC | C. Martin | |
175 | MPP-220 |
Implement the publication through FESA of the additional signals (threshold values and measured value) and update the EDMS document LHC | M. Di Castro | |
174 | MPP-208 |
Draft a procedure for the tracking of the bypassed equipment PBS | J. Uythoven | |
173 | MPP-208 |
Organize a meeting between OP and the MPE SW team to define the specifications for an improved GUI PBS | B. Mikulec | |
172 | MPP-218 |
Review the inconsistency that the WIC will not interlock the beam in case of a power converter failure, but still interlock the beam in case of a magnet failure PBS | G.P. Di Giovanni, MPP, D. Nisbet | |
171 | MPP-218 |
Update the ECR and circulate it for approval PBS | G.P. Di Giovanni | |
170 | MPP-211 |
Implement the proposed operational limits for the ADT excitation LHC | D. Valuch | |
169 | MPP-211 |
Obtain more inputs on the possibility of a cold weld from EN-MME LHC | J. Uythoven | |
168 | MPP-211 |
Perform opening test with the velo before the LMC, including video LHC | F. Sanders | |
167 | MPP-211 |
Propose a proper timeline for a possible replacement scenario LHC | F. Sanders | |
166 | MPP-213 |
Study necessity and feasibility of special interlock configuration for LINAC4 3 MeV runs Linac4 | P. Skowronski | |
165 | MPP-213 |
Initiate study of alternative interlock configuration and failure diagnostics for Linac4 and possibly other injectors Linac4 | P. Skowronski | |
164 | MPP-213 |
Organise discussion about changing RF to HV as actuator for the source BIC and report back to the MPP Linac4 | D. Nisbet | |
163 | MPP-213 |
Update BIS specification (page 2) clarifying present and future situation wrt RF actuator Linac4PSB | C. Martin | |
162 | MPP-213 |
Update specifications “Logic for SIS Software Verification of LEBT Parameters” and send around for approval Linac4 | R. Scrivens | |
161 | MPP-214 |
Update the BLM machine protection commissioning procedure with tests to ensure that the “beam info” bypass devices are removed prior to operation LHC | B. Salvachua, C. Zamantzas | |
160 | MPP-214 |
Communicate the list of variable names (for NXCALS) that are needed to assess the latency of the full chain LHC | J. Uythoven | |
159 | MPP-214 |
Ensure that the issues currently requiring the masking of XPOC are resolved before declaring stable beams LHC | N. Magnin | |
158 | MPP-215 |
Verify high pileup implications Linac4 | A. Lombardi | |
157 | MPP-217 |
Verify high pileup implications LHC | F. Moortgat | |
156 | MPP-217 |
Circulate the BCCM procedure LHC | M. Gasior | |
155 | MPP-217 |
Circulate the BPF procedure LHC | R. Secondo | |
154 | MPP-217 |
Update SMP procedure and add that the BPF checks after each injection are done implicitly by the BIS LHC | R. Secondo | |
153 | MPP-217 |
Include BPF tests in the SMP IPOC procedure LHC | R. Secondo | |
152 | MPP-209 |
Add ARP interlock checks to the checklist based on previous EDMS documents LHC | C. Hernalsteens, I. Lopez | |
151 | MPP-209 |
Plan interlocks tests (basic interlock functionalities for each pot and comprehensive test in a dry run with changing beam modes and flags) LHC | BE-OP, M. Deile | |
150 | MPP-209 |
Add TOTEM/CTPPS interlock tests to the checklist LHC | C. Hernalsteens, M. Deile | |
149 | MPP-209 |
Discuss the handling of the redundant energy and beta* limits and propose possible improvements LHC | Collimation, BE-OP | |
148 | MPP-209 |
Circulate a list of people for check and approve the EDMS procedure LHC | C. Hernalsteens | |
147 | MPP-209 |
Give administrator access to MPP representatives and user access to the people who will fill in the results, verify with each system representative LHC | C. Hernalsteens | |
146 | MPP-210 |
Define and create checklist tests for collimation, BLMs and the RF system LHC | J. Wenninger, H. Timko, C. Hernalsteens | |
145 | MPP-207 |
Decide if a filter on the signal of the BLMs behind the dumps is needed to avoid saturation LHC | C. Wiesner, A. Lechner, Y. Dutheil | |
144 | MPP-207 |
Evaluate feasibility of porting UFO Buster data acquisition from SDDS files to Post Mortem LHC | A. Lechner, J.C. Garnier, C. Zamantzas | |
143 | MPP-207 |
Add TDE N2 pressure interlock gauges to SIS following LS2 updates LHC | J. Wenninger | |
142 | MPP-207 |
Evaluate feasibility of implementing interlock based on the correct transfer line optics ID generated by SIS LHC | J. Wenninger | |
141 | MPP-207 |
Check if the Beta* and energy gap interlock functionality is implemented in the TCDIs LHC | Y. Dutheil | |
140 | MPP-207 |
Check if energy extraction switches opening signal sent from SIS is correctly received by the CIRCUIT SCADA LHC | J. Wenninger, A. Antoine | |
139 | MPP-206 |
Add commissioning of blindable BLMs to the injection procedure LHC | Y. Dutheil | |
138 | MPP-206 |
Release AGK commissioning document in EDMS and link to MPP tree LHC | Y. Dutheil | |
137 | MPP-205 |
Coordinate with C.Martin (TE-MPE-MI) to verify CIBU connections of the vacuum system LHC | G. Pigny | |
136 | MPP-205 |
Validation of automatic script for the vacuum checkout tests LHC | G. Pigny | |
135 | MPP-204 |
Update PIC commissioning procedure (EDMS-896390) with the validation of the new current dependent GPM function, including coupling the tests of RB and RQ circuits LHC | A. Antoine | |
134 | MPP-201 |
Update signal names for N2 pressure gauges interlocked in the SIS and re-establish the SIS injection interlock on too low N2 pressure LHC | J. Wenninger, M. Di Castro | 2021-08-31 |
133 | MPP-198 |
Operation of LHCb velo at 450 GeV: Estimate the available aperture for a velo closing at 450 GeV in collaboration with optics and collimation teams and propose the measurement of the aperture in IP8 at injection before any physics operation at injection LHC | V. Coco | 2021-03-31 |
132 | MPP-198 |
LHCb velo motion system: Implement signal from limit switches to the VSS LHC | X. Pons | 2021-03-31 |
131 | MPP-198 |
LHCb velo motion system: Prepare a detailed procedure for manual movement and perform the procedure in full when the detector is installed with active control system to monitor the movement and avoid damage to the limit switches LHC | V. Coco, F. Sanders | 2021-03-31 |
130 | MPP-198 |
LHCb velo motion system: Evaluate if a warning could be produced if the VELO alignment algorithm attempts to move one side beyond the 0 mm point LHC | V. Coco | 2021-03-31 |
129 | MPP-198 |
LHCb velo motion system: Prepare a specifications document for the motion control, failures and interlocks LHC | X. Pons | 2021-03-31 |
128 | MPP-179 |
Evaluate how the masking of watchdog interlocks in the SIS can be only allowed for short pulse lengths Linac4 | B. Mikulec | 2021-04-30 |
127 | MPP-181 |
Clarify the current settings of the SMP min/max beta* values LHC | R. Secondo, J. Wenninger | |
126 | MPP-181 |
Add follow-up list from MPP workshop to MPP website and schedule MPP meetings on the different topics LHC | MPP | |
125 | MPP-181 |
Formalize the list of alternate members for the rMPP and update e-groups and slides on Indico LHC | C. Wiesner, M. Zerlauth | |
124 | MPP-188 |
Clarify if the central values of LEBT settings should be stored as LSA virtual parameter to allow them to be read out by the foreseen sequencer task, taking into account the experience of similar applications in the injectors Linac4 | B. Mikulec, R. Scrivens | |
123 | MPP-188 |
Review the specifications for the Linac4 sequencer task for switching to the low-intensity mode (EDMS L4-C-PRD-0001) in order to ensure coherence with the new “Logic for SIS Software Verification of LEBT Parameters” (EDMS L4-CIB-ES-0007) Linac4 | B. Mikulec, R. Scrivens | |
122 | MPP-188 |
Evaluate RF interlocking and recovery procedure based on the experience from the Linac4 commissioning and early operation and report the results to the MPP Linac4 | R. Wegner | |
121 | MPP-201 |
Implement additional software threshold for maximum losses during the slow extraction SPS | M. Fraser, V. Kain | |
120 | MPP-201 |
Add position IN switches to the TECS hardware interlock SPS | M. Di Castro | |
119 | MPP-201 |
Add position IN switches to the TECS hardware interlock SPS | M. Di Castro | |
118 | MPP-201 |
Prepare and organize review of the SPS slow extraction system SPS | MPP, TE-ABT, BE-OP | |
117 | MPP-200 |
Propose how to protect the CTRB interface of the BLMs to the timing system against accidental changes and overwriting via FESA, in collaboration with the timing team Linac4PSBPS | J. Uythoven, S. Jackson | |
116 | MPP-199 |
Discuss with equipment owners and OP in Linac4, PS and PSB if the 1.2s delay can be removed for the injectors upstream of the SPS and decide when this change can be implemented and update the specification accordingly Linac4PSBPS | J. Uythoven, R. Mompo | 2021-11-30 |
115 | MPP-197 |
Organize a discussion on the BIS GUI for the injectors PSB | J. Uythoven | |
114 | MPP-197 |
Circulate the information on the non-conformities to the MPP representatives for the different equipment LHC | J. Uythoven, D. Wollmann | |
113 | MPP-197 |
Verify how the connection has been done between POPS-B and BIS and describe the user input to BIS PSB | F. Boattini | |
112 | MPP-196 |
Verify the maximum allowed XRP temperature with TE-VSC, taking into account outgassing and the temperature of the ferrites LHC | M. Trzebinski | |
111 | MPP-195 COLLWG |
Study the option of using the space in UJ76 during Run III LHC | M. Gasior, T. Levens | |
110 | MPP-195 COLLWG |
Determine a strategy for P8 LHC | Collimation, R. Bruce | |
109 | MPP-195 COLLWG |
Circulate a list of expected redundancies for run III LHC | Collimation, R. Bruce | |
108 | MPP-195 COLLWG |
Check orbit at the crystal during injection failure LHC | Collimation | |
107 | MPP-195 COLLWG |
Produce detailed operational scenarios and required validation for the use of the crystals LHC | Collimation | |
106 | MPP-195 COLLWG |
Produce commissioning procedure for the crystals LHC | Collimation | |
105 | MPP-195 COLLWG |
Check the angle change at the crystal during 10Hz orbit oscillations LHC | Collimation | |
104 | MPP-193 |
Evaluate the potential gain and feasibility of evaluating the beam orbit at the collimator BPMs before starting the ramp-up of the BBLR wire current and issuing a warning if required LHC | G. Sterbini, S. Radaelli, J. Wenninger | |
103 | MPP-193 |
Evaluate together with the LPC the potential effect of BBCW operation on luminosity and luminous region LHC | Y. Papaphilippou, G. Sterbini | 2021-05-01 |
102 | MPP-193 |
Update and circulate the procedure for “BBCW Commissioning and Revalidation after Failure Recovery” and then upload it on EDMS for approval LHC | A. Rossi | |
101 | MPP-193 |
Propose safe and reliable solution to force the BBCW user input to the WIC to TRUE in order to resume beam operation without BBCW LHC | A. Rossi, R. Mompo | |
100 | MPP-193 |
Confirm revalidation procedure for the BBCW after loss of collimator coolant LHC | A. Rossi, M. Di Castro | |
99 | MPP-193 |
Define required qualification tests for the BBCW after a TS and YETS LHC | A. Rossi | |
98 | MPP-193 |
Review the necessity to keep the existing SIS interlock on the BBCW PC current LHC | A. Rossi, J. Wenninger | 2021-05-01 |
97 | MPP-193 |
Reassess the temperature load on the BPMs in both TCSP jaws in case of an asynchronous beam dump considering the worst-case (type 2) erratic LHC | F. Carra, A. Lechner | 2021-06-30 |
96 | MPP-193 |
Update expected energy deposition based on the newest FLUKA studies for the case of an asynchronous beam dump and an injection error for the relevant collimator materials LHC | F. Carra, A. Lechner | 2021-06-30 |
95 | MPP-194 |
Update and approval of the procedure for injection without stripping foil (EDMS 2370098) following the comments from the MPP PSB | B. Mikulec | |
94 | MPP-186 |
Evaluate if automatic checks of the internal performance of the SPS BIS systems are required SPS | J. Uythoven | |
93 | MPP-186 |
Discuss with the MD coordinators for all the injector chain the role of rMPP in the preparation of machine protection critical MD SPSPSPSBLinac4 | J. Uythoven | |
92 | MPP-186 |
Verify the acceptance of the proposed members to be part of the rMPP for injectors, for those not present at the meeting SPSPSPSBLinac4 | J. Uythoven | |
91 | MPP-186 |
Present the extension of the rMPP mandate to the injectors to the IEFC SPSPSPSBLinac4 | J. Uythoven | |
90 | MPP-186 |
Update specifications of the MDSH PC SPS | D. Nisbet | |
89 | MPP-186 |
Update specifications for the SPS and TT10 WIC with the modified MDSH connections SPS | R. Mompo | 2021-06-01 |
88 | MPP-186 |
Update the specifications for the SPS Injection BIS with the new “MKP enabled” input to the TT2-TT10 slave BIC SPS | I. Romera | |
87 | MPP-186 |
Update commissioning procedure and checklists for injection tests with new MDSH functionality SPS | V. Kain, BE-OP | |
86 | MPP-186 |
Install new connection “MKP enabled” from the MKP to the TT2-TT10 slave BIC PSSPS | I. Romera, TE-MPE-MI | |
85 | MPP-189 |
Study how to implement an online optics model and related configuration management depending on the optics Linac4 | B. Mikulec, R. Scrivens | |
84 | MPP-184 |
Propose RBAC roles for Machine Critical Settings at LINAC4/PSB for implementation as soon as reasonable Linac4PSB | B. Mikulec | |
83 | MPP-182 |
Define procedure under which circumstances and how to change the high-loss LINAC4 watchdog limits, including roll back to standard operation Linac4 | A. Lombardi | 2021-04-30 |
82 | MPP-182 |
Write procedure for injection into less than four PSB rings PSB | B. Mikulec | |
81 | MPP-182 |
Make proposal for the decision-taking process of masking critical interlock channels Linac4PSB | J. Uythoven | |
80 | MPP-182 |
Investigate and if possible implement the link between BIS and External Conditions. Otherwise, implement link via SIS Linac4PSB | B. Mikulec, G. Kruk | |
79 | MPP-182 |
Update the ECR on “PSB External Conditions for Post-LS2”, removing the WIC connection to the EC PSB | M. Serano | |
78 | MPP-182 |
Update the LINAC4/PSB specification of the BIS, replacing the input from the External Conditions LHC | C. Martin | |
77 | MPP-181 |
All groups and teams should verify their proposed MPP representative and inform Christoph and/or Jan if they have comments or suggestions LHC | MPP | |
76 | MPP-179 |
Organise pre-discussion on LINAC4 Caesiation Linac4 | J. Uythoven | |
75 | MPP-179 |
Check feasibility of implementing absolute watchdogs thresholds in hardware (i.e. lost number of particles/charges), which are not scaled with the pulse length Linac4 | B. Mikulec, F. Roncarolo | |
74 | MPP-179 |
Identify relevant locations and beam parameters for energy-deposition studies at LINAC4 Linac4 | B. Mikulec, A. Lechner, A. Lombardi | 2021-04-30 |
73 | MPP-179 |
Propose values for BLM hardware settings PSB | B. Mikulec | 2021-04-30 |
72 | MPP-179 |
Evaluate if there are additional aperture bottlenecks, where damage might lead to longer downtime than required for a bellow replacement Linac4 | A. Lombardi | 2021-04-30 |
71 | MPP-179 |
Evaluate best implementation to send automatic reminders of all active SIS masks for every shift PSB | B. Mikulec | 2021-04-30 |
70 | MPP-179 |
Check a) the possibility of using RBAC roles for the change of non-MCS settings and b) the feasibility of using the existing MCS framework, which automatically includes RBAC-role handling, to protect the virtual settings PSB | B. Mikulec | |
69 | MPP-179 |
Write down technical specifications and implementation for the signals migrated to the new timing-system functionality (PSB/PS) PSBPS | B. Mikulec | |
68 | MPP-179 |
Write down technical specifications and implementation (including list of concerned signals) for the consolidated External Conditions PSBPS | B. Schofield | |
64 | MPP-192 |
Report on the first operational experience of the SPS BLM system after LS2 LHC | SY-ABT, BE-OP | 2021-11-30 |
63 | MPP-191 |
IQC application and future development: Add an update of the IQC settings for abort gap keeper settings changes LHC | SY-ABT, BE-OP | |
62 | MPP-191 |
IQC application and future development: Discuss the use cases and give inputs for the FESA/firmware preparation for the new dBLM readout electronics LHC | J. Wenninger, E. Calvo | |
61 | MPP-191 |
iBPMs layout in Run3: Propose criteria for iBPM validation before switching to the new system (performance / specifications / reliability criteria) LHC | A. Boccardi | |
60 | MPP-191 |
iBPMs layout in Run3: Discussion on iBPM firmware and possible failure cases LHC | A. Boccardi | |
59 | MPP-191 |
AC-dipole operation with three bunches: Check the interlocking with triplet BLM for 1 pilot and for 3 pilots LHC | OMC, R. Tomas, Collimation | |
58 | MPP-191 |
AC-dipole operation with three bunches: Prepare a procedure for use of 3 bunches after first optics optimization for OMC measurements LHC | OMC | |
57 | MPP-191 |
AC-dipole operation with three bunches: Propose a solution for the introduction of a separate SMP equation for OMC operation with 3 pilot bunches (4E10 protons) LHC | J. Uythoven, TE-MPE-MI | |
56 | MPP-187 |
Study the effect of the modified MKB waveforms on the flashover failure scenario LHC | Y. Dutheil, A. Lechner, TE-ABT, EN-STI | 2021-06-30 |
55 | MPP-187 |
Based on first operational experience after LS2, review the steering procedure and evaluate the possibility of steering with full trains LHC | C. Bracco, TE-ABT | 2022-04-30 |
54 | MPP-187 |
Investigate the implementation of a SIS based interlock of the integrated intensity of consecutive bunches. Define the maximum number of bunches that have to be taken into account for averaging the bunch intensity LHC | J. Wenninger, BE-OP, MPP | 2021-08-31 |
53 | MPP-185 |
Analyse if a limit in the number of consecutive dumps or a minimum time between the dumps is required for Run3 operation LHC | M. Calviani, C. Bracco, EN-STI, TE-ABT | 2022-07-31 |
52 | MPP-185 |
Decide if hardware interlock possibilities for the permanent mechanical displacement of the dump have to be foreseen LHC | M. Calviani | 2022-07-31 |
51 | MPP-185 |
Verify available resources to implement the new orbit interlocking during LS2 LHC | J. Wenninger | |
50 | MPP-183 |
Update and finalise functional specifications and commissioning procedure for the BCCM, including adaptability of loss threshold settings LHC | D. Wollmann, M. Zerlauth, TE-MPE, M. Gasior, BE-BI | |
49 | MPP-183 |
Specify required data (window size and number of points per integration window) to be sent from the BCCM to Post Mortem, and evaluate feasibility to implement automatic check of BCCM trigger in BIS IPOC LHC | J.C. Garnier | 2021-03-31 |
48 | MPP-183 |
Update the Functional Specifications of the SMP with the currently used beta* limits LHC | R. Secondo | |
47 | MPP-177 |
Evaluate feasibility and implications with OP and CO to include an 'MD mask' level in the SIS LHC | J. Wenninger, BE-OP | |
46 | MPP-177 |
Include crystals into recovery sequences for Run 3 and integrate crystals into collimator fixed displays LHC | S. Radaelli, BE-OP | 2021-11-21 |
45 | MPP-177 |
Specify line of responsibility for the BBCW temperature interlock for commissioning and operational follow-up LHC | S. Radaelli, A. Rossi, BE-BI | |
44 | MPP-177 |
Repeat response-time measurement with FGC2 system and report results in an AOB at the MPP LHC | R. Mompo | |
43 | MPP-176 |
Write commissioning procedure for the BBCW with and without beam, including reliable check of the wire polarities LHC | A. Rossi | |
42 | MPP-176 |
Measure delay time of the interlock chain for the BBCW, including a WIC unit, in case of a PC trip LHC | TE-MPE-MI | |
41 | MPP-176 |
Write specification for the temperature interlock logic and the filtering of the unphysical temperature sensor readings in the LHC collimator jaws and cooling circuits, and implement them after acceptance LHC | M. Di Castro, EN-SMM | 2021-06-30 |
40 | MPP-175 |
Evaluate and define damage limit for SPS beams, based on FLUKA studies if required. Provide the limit as input for BI SPS | BE-OP-SPS, K. Li | |
39 | MPP-175 |
Check status and proper functioning of the SPS BPM interlocks and their connection to the BIS SPS | BE-OP-SPS, K. Li | |
38 | MPP-174 |
The functional specifications for the new CO2 cooling safety system have to be written down, including the expected pressure increase and reaction time as well as the expected consequences and required switches and interlocks LHC | LHCb, TE-VSC | |
37 | MPP-174 |
Clarify who is using the beam mode UNSTABLE BEAMS and what implications it would have to remove it. If removed, it should be removed consistently in all the experiments LHC | BE-OP, J. Wenninger | |
36 | MPP-174 |
Review new movement control and interlocking logic/implementation in fourth quarter 2019 LHC | MPP, X. Pons, LHCb | |
35 | MPP-174 |
Clarify procedure for manual retraction of the VELO and for yearly testing of its functionality LHC | LHCb | |
34 | MPP-169 |
Test steps of the emergency dump procedure related to the LBDS after TS2 LHC | M. Solfaroli, N. Magnin | 2021-11-30 |
33 | MPP-169 |
Request functionality to open up excitation window of ADT and prepare OP sequence for scraping the full LHC beam LHC | D. Valuch, MPP | |
32 | MPP-163 |
Prepare a summary slide to show which parameters are checked and how, referring to the AOB - Abort Gap Keeper - protection of fine delay parameter LHC | J. Wenninger | |
31 | MPP-161 |
The TDE pressure interlock should be masked with the new expert mode and unmasked when needed; the injection veto interlock will not be touched LHC | J. Wenninger | |
30 | MPP-161 |
Verify with MP3 if a SIS interlock on DFB temperature is required or if it is sufficient to take care of this via procedures LHC | MPP | |
29 | MPP-160 |
Send schematics of interlock to MPE to verify the interlock card and if re-testing is required LHC | A. Rossi | |
28 | MPP-157 |
Check on redundant powering of the LBDS (UPS test) LHC | TE-ABT | |
27 | MPP-157 |
Request from the impedance team an official statement on the use of the crystal chamber with ion physics beam LHC | Collimation | |
26 | MPP-157 |
Include into the BLM disabling rules a restriction for IPQs in LSS that BLMs in position 2 and 3 are not disabled at the same time LHC | E. B. Holzer | |
25 | MPP-156 |
Define use cases for the DOROS BPMs in IR7 collimators LHC | Collimation | |
24 | MPP-155 |
Operational scenarios and bunch intensities, beam types to be considered for the new BPMs electronics for IR6 LHC | BE-OP, MPP | |
23 | MPP-152 |
Verify the phase advances from the MKDs to the TCPs and how many bunches can escape the TCDQ if injected the abort gap LHC | SY-ABT, Collimation | |
22 | MPP-151 |
Summarize planned changes in the BLMs around the TDEs in an ECR LHC | SY-ABT, SY-BI | 2021-08-31 |
21 | Verify expected beta beating at critical elements like TCTs or IR6 dump protection in case of a CLIQ mis-firing LHC | B. Lindstrom | ||
20 | Investigate whether it is needed to implement a smoother change of the tolerance during squeeze instead of going from 4 to 1 sigmas at the end LHC | BE-OP-LHC, Collimation | ||
19 | MPP-149 |
Review other failure cases for RD1 and estimate the associated FMCM signals LHC | TE-MPE-PE | |
18 | MPP-146 |
Study the feasibility of a variable window for PC interlocking LHC | TE-EPC | |
17 | MPP-145 |
Produce procedure to be performed after any change of the AGK length LHC | N. Magnin | 2021-06-01 |
16 | MPP-143 |
BLM inhibit in case of too high transverse losses with injection: propose commissioning test to verify functionality LHC | BE-BI, SY-ABT | 2021-04-15 |
15 | MPP-143 |
BCCM: Make post mortem data operational for BCCM and reduce BCCM trigger levels for all running sums during the beam commissioning to fully exploit the experience from loss maps etc. LHC | BE-BI | |
14 | MPP-139 |
Provide input to Christos concerning testing the BLM reaction time at 450 GeV and top energy in case of a RD1, RD34 powering failure LHC | MPP | |
13 | MPP-137 |
Organise a circulating checklist with points to be followed up between the CC team and MPP; iterate during a coffee discussion early January LHC | CC team, MPP | |
12 | MPP-133 |
Verify which vacuum valves closed during the 2/9/16 MKI erratic LHC | TE-ABT | |
11 | MPP-133 |
Further understand the quench of Q2 during the 2/9/16 MKI erratic LHC | BLMTWG, MP3 | |
10 | MPP-125 |
Discuss how to check the status of the BCT buffer. Evaluate the new IQC module to see how often the SPS BCT buffers jump to zero LHC | M. Pojer | |
9 | MPP-124 |
Confirm number of extra bunches the IP7 collimators can take during a type 2 erratic and if this causes a problem LHC | R. Bruce | |
8 | MPP-119 |
Conduct systematic simulation studies on beam scraping by collimators in case of non-working dump LHC | M. Solfaroli, M. Valette | |
7 | MPP-119 |
Discuss the implementation of a passive beam presence flag LHC | M. Solfaroli, M. Valette | |
6 | MPP-118 |
Include cross-check of BIS self-triggering in BIS IPOC module LHC | I. Romera | 2021-05-31 |
5 | MPP-104 |
Discuss the final thresholds for collimators including BLM response between BLMTWG and the Collimation team LHC | A. Lechner, B. Salvachua | 2021-07-31 |
4 | MPP-101 |
Finalize a list of commissioning steps for the BCCM LHC | D. Belohrad | |
3 | MPP-98 |
Communicate flag to be surveyed by the LHC SIS for the remote surveillance of the VME and cPCI creates to Jorg and agree on testing LHC | N. Magnin, E. Carlier, J. Wenninger | |
2 | MPP-93 |
Calculate magnets damage limits at 450 GeV and 7 TeV LHC | Collimation, MPP | |
1 | MPP-92 |
Review protection limit of inner triplet (80K) with realistic impact distributions LHC | A. Lechner, MPP |