List of actions¶
Meeting | Description | Responsible | Deadline | |
---|---|---|---|---|
204 | MPP-234 |
Define the filling schemes corresponding to each intensity step LHC | C. Wiesner, F. Moortgat | |
202 | MPP-234 |
Define the optics steps at which the measurements will take place and agree with OP for a slot to perform them LHC | BE-OP, C. Hernalsteens | |
191 | MPP-222 |
Provide semi-flat functions to test 2023 Beta* levelling mechanics in 2022 without interfering with levelling LHC | M. Hostettler, D. Mirarchi | |
190 | MPP-223 |
Confirm the length of the ADT excitation window in terms of number of bunches LHC | C. Hernalsteens | |
189 | MPP-223 |
Identify and solve the BLM XPOC issue LHC | C. Zamantzas | |
188 | MPP-223 |
Report on the validation of the diode solution for the LSS3 BLMs issue LHC | C. Zamantzas | |
186 | MPP-224 COLLWG |
Follow -up on the delay of the beam dumped event sent out over the timing system LHC | G. Kruk | |
184 | MPP-224 COLLWG |
Define the list of required loss maps for critical scenario LHC | BE-OP, Collimation | |
181 | MPP-227 |
Perform all BBWC tests to allow the powering of the wires during the ramp-up once the software is ready LHC | G. Sterbini | |
178 | MPP-230 |
Report on the currently tested options to minimize the bunch length dependence of the BCCM signals LHC | M. Gasior | |
171 | MPP-218 |
Update the ECR and circulate it for approval PBS | G.P. Di Giovanni | |
169 | MPP-211 |
Obtain more inputs on the possibility of a cold weld from EN-MME LHC | J. Uythoven | |
168 | MPP-211 |
Perform opening test with the velo before the LMC, including video LHC | F. Sanders | |
164 | MPP-213 |
Organise discussion about changing RF to HV as actuator for the source BIC and report back to the MPP Linac4 | D. Nisbet | |
162 | MPP-213 |
Update specifications “Logic for SIS Software Verification of LEBT Parameters” and send around for approval Linac4 | R. Scrivens | |
160 | MPP-214 |
Communicate the list of variable names (for NXCALS) that are needed to assess the latency of the full chain LHC | J. Uythoven | |
159 | MPP-214 |
Ensure that the issues currently requiring the masking of XPOC are resolved before declaring stable beams LHC | N. Magnin | |
158 | MPP-215 |
Verify high pileup implications Linac4 | A. Lombardi | |
157 | MPP-217 |
Verify high pileup implications LHC | F. Moortgat | |
156 | MPP-217 |
Circulate the BCCM procedure LHC | M. Gasior | |
155 | MPP-217 |
Circulate the BPF procedure LHC | R. Secondo | |
152 | MPP-209 |
Add ARP interlock checks to the checklist based on previous EDMS documents LHC | C. Hernalsteens, I. Lopez | |
151 | MPP-209 |
Plan interlocks tests (basic interlock functionalities for each pot and comprehensive test in a dry run with changing beam modes and flags) LHC | BE-OP, M. Deile | |
150 | MPP-209 |
Add TOTEM/CTPPS interlock tests to the checklist LHC | C. Hernalsteens, M. Deile | |
148 | MPP-209 |
Circulate a list of people for check and approve the EDMS procedure LHC | C. Hernalsteens | |
147 | MPP-209 |
Give administrator access to MPP representatives and user access to the people who will fill in the results, verify with each system representative LHC | C. Hernalsteens | |
146 | MPP-210 |
Define and create checklist tests for collimation, BLMs and the RF system LHC | J. Wenninger, H. Timko, C. Hernalsteens | |
143 | MPP-207 |
Add TDE N2 pressure interlock gauges to SIS following LS2 updates LHC | J. Wenninger | |
138 | MPP-206 |
Release AGK commissioning document in EDMS and link to MPP tree LHC | Y. Dutheil | |
137 | MPP-205 |
Coordinate with C.Martin (TE-MPE-MI) to verify CIBU connections of the vacuum system LHC | G. Pigny | |
136 | MPP-205 |
Validation of automatic script for the vacuum checkout tests LHC | G. Pigny | |
135 | MPP-204 |
Update PIC commissioning procedure (EDMS-896390) with the validation of the new current dependent GPM function, including coupling the tests of RB and RQ circuits LHC | A. Antoine | |
134 | MPP-201 |
Update signal names for N2 pressure gauges interlocked in the SIS and re-establish the SIS injection interlock on too low N2 pressure LHC | J. Wenninger, M. Di Castro | 2021-08-31 |
133 | MPP-198 |
Operation of LHCb velo at 450 GeV: Estimate the available aperture for a velo closing at 450 GeV in collaboration with optics and collimation teams and propose the measurement of the aperture in IP8 at injection before any physics operation at injection LHC | V. Coco | 2021-03-31 |
127 | MPP-181 |
Clarify the current settings of the SMP min/max beta* values LHC | R. Secondo, J. Wenninger | |
126 | MPP-181 |
Add follow-up list from MPP workshop to MPP website and schedule MPP meetings on the different topics LHC | MPP | |
125 | MPP-181 |
Formalize the list of alternate members for the rMPP and update e-groups and slides on Indico LHC | C. Wiesner, M. Zerlauth | |
124 | MPP-188 |
Clarify if the central values of LEBT settings should be stored as LSA virtual parameter to allow them to be read out by the foreseen sequencer task, taking into account the experience of similar applications in the injectors Linac4 | B. Mikulec, R. Scrivens | |
123 | MPP-188 |
Review the specifications for the Linac4 sequencer task for switching to the low-intensity mode (EDMS L4-C-PRD-0001) in order to ensure coherence with the new “Logic for SIS Software Verification of LEBT Parameters” (EDMS L4-CIB-ES-0007) Linac4 | B. Mikulec, R. Scrivens | |
122 | MPP-188 |
Evaluate RF interlocking and recovery procedure based on the experience from the Linac4 commissioning and early operation and report the results to the MPP Linac4 | R. Wegner | |
120 | MPP-201 |
Add position IN switches to the TECS hardware interlock SPS | M. Di Castro | |
119 | MPP-201 |
Add position IN switches to the TECS hardware interlock SPS | M. Di Castro | |
116 | MPP-199 |
Discuss with equipment owners and OP in Linac4, PS and PSB if the 1.2s delay can be removed for the injectors upstream of the SPS and decide when this change can be implemented and update the specification accordingly Linac4PSBPS | J. Uythoven, R. Mompo | 2021-11-30 |
114 | MPP-197 |
Circulate the information on the non-conformities to the MPP representatives for the different equipment LHC | J. Uythoven, D. Wollmann | |
105 | MPP-195 COLLWG |
Check the angle change at the crystal during 10Hz orbit oscillations LHC | Collimation | |
103 | MPP-193 |
Evaluate together with the LPC the potential effect of BBCW operation on luminosity and luminous region LHC | Y. Papaphilippou, G. Sterbini | 2021-05-01 |
102 | MPP-193 |
Update and circulate the procedure for “BBCW Commissioning and Revalidation after Failure Recovery” and then upload it on EDMS for approval LHC | A. Rossi | |
101 | MPP-193 |
Propose safe and reliable solution to force the BBCW user input to the WIC to TRUE in order to resume beam operation without BBCW LHC | A. Rossi, R. Mompo | |
100 | MPP-193 |
Confirm revalidation procedure for the BBCW after loss of collimator coolant LHC | A. Rossi, M. Di Castro | |
99 | MPP-193 |
Define required qualification tests for the BBCW after a TS and YETS LHC | A. Rossi | |
98 | MPP-193 |
Review the necessity to keep the existing SIS interlock on the BBCW PC current LHC | A. Rossi, J. Wenninger | 2021-05-01 |
95 | MPP-194 |
Update and approval of the procedure for injection without stripping foil (EDMS 2370098) following the comments from the MPP PSB | B. Mikulec | |
93 | MPP-186 |
Discuss with the MD coordinators for all the injector chain the role of rMPP in the preparation of machine protection critical MD SPSPSPSBLinac4 | J. Uythoven | |
92 | MPP-186 |
Verify the acceptance of the proposed members to be part of the rMPP for injectors, for those not present at the meeting SPSPSPSBLinac4 | J. Uythoven | |
91 | MPP-186 |
Present the extension of the rMPP mandate to the injectors to the IEFC SPSPSPSBLinac4 | J. Uythoven | |
90 | MPP-186 |
Update specifications of the MDSH PC SPS | D. Nisbet | |
88 | MPP-186 |
Update the specifications for the SPS Injection BIS with the new “MKP enabled” input to the TT2-TT10 slave BIC SPS | I. Romera | |
87 | MPP-186 |
Update commissioning procedure and checklists for injection tests with new MDSH functionality SPS | V. Kain, BE-OP | |
86 | MPP-186 |
Install new connection “MKP enabled” from the MKP to the TT2-TT10 slave BIC PSSPS | I. Romera, TE-MPE-MI | |
82 | MPP-182 |
Write procedure for injection into less than four PSB rings PSB | B. Mikulec | |
81 | MPP-182 |
Make proposal for the decision-taking process of masking critical interlock channels Linac4PSB | J. Uythoven | |
79 | MPP-182 |
Update the ECR on “PSB External Conditions for Post-LS2”, removing the WIC connection to the EC PSB | M. Serano | |
78 | MPP-182 |
Update the LINAC4/PSB specification of the BIS, replacing the input from the External Conditions LHC | C. Martin | |
77 | MPP-181 |
All groups and teams should verify their proposed MPP representative and inform Christoph and/or Jan if they have comments or suggestions LHC | MPP | |
76 | MPP-179 |
Organise pre-discussion on LINAC4 Caesiation Linac4 | J. Uythoven | |
75 | MPP-179 |
Check feasibility of implementing absolute watchdogs thresholds in hardware (i.e. lost number of particles/charges), which are not scaled with the pulse length Linac4 | B. Mikulec, F. Roncarolo | |
70 | MPP-179 |
Check a) the possibility of using RBAC roles for the change of non-MCS settings and b) the feasibility of using the existing MCS framework, which automatically includes RBAC-role handling, to protect the virtual settings PSB | B. Mikulec | |
69 | MPP-179 |
Write down technical specifications and implementation for the signals migrated to the new timing-system functionality (PSB/PS) PSBPS | B. Mikulec | |
68 | MPP-179 |
Write down technical specifications and implementation (including list of concerned signals) for the consolidated External Conditions PSBPS | B. Schofield | |
58 | MPP-191 |
AC-dipole operation with three bunches: Prepare a procedure for use of 3 bunches after first optics optimization for OMC measurements LHC | OMC | |
57 | MPP-191 |
AC-dipole operation with three bunches: Propose a solution for the introduction of a separate SMP equation for OMC operation with 3 pilot bunches (4E10 protons) LHC | J. Uythoven, TE-MPE-MI | |
52 | MPP-185 |
Decide if hardware interlock possibilities for the permanent mechanical displacement of the dump have to be foreseen LHC | M. Calviani | 2022-07-31 |
51 | MPP-185 |
Verify available resources to implement the new orbit interlocking during LS2 LHC | J. Wenninger | |
50 | MPP-183 |
Update and finalise functional specifications and commissioning procedure for the BCCM, including adaptability of loss threshold settings LHC | D. Wollmann, M. Zerlauth, TE-MPE, M. Gasior, BE-BI | |
49 | MPP-183 |
Specify required data (window size and number of points per integration window) to be sent from the BCCM to Post Mortem, and evaluate feasibility to implement automatic check of BCCM trigger in BIS IPOC LHC | J.C. Garnier | 2021-03-31 |
48 | MPP-183 |
Update the Functional Specifications of the SMP with the currently used beta* limits LHC | R. Secondo | |
47 | MPP-177 |
Evaluate feasibility and implications with OP and CO to include an 'MD mask' level in the SIS LHC | J. Wenninger, BE-OP | |
46 | MPP-177 |
Include crystals into recovery sequences for Run 3 and integrate crystals into collimator fixed displays LHC | S. Radaelli, BE-OP | 2021-11-21 |
45 | MPP-177 |
Specify line of responsibility for the BBCW temperature interlock for commissioning and operational follow-up LHC | S. Radaelli, A. Rossi, BE-BI | |
44 | MPP-177 |
Repeat response-time measurement with FGC2 system and report results in an AOB at the MPP LHC | R. Mompo | |
43 | MPP-176 |
Write commissioning procedure for the BBCW with and without beam, including reliable check of the wire polarities LHC | A. Rossi | |
42 | MPP-176 |
Measure delay time of the interlock chain for the BBCW, including a WIC unit, in case of a PC trip LHC | TE-MPE-MI | |
41 | MPP-176 |
Write specification for the temperature interlock logic and the filtering of the unphysical temperature sensor readings in the LHC collimator jaws and cooling circuits, and implement them after acceptance LHC | M. Di Castro, EN-SMM | 2021-06-30 |
40 | MPP-175 |
Evaluate and define damage limit for SPS beams, based on FLUKA studies if required. Provide the limit as input for BI SPS | BE-OP-SPS, K. Li | |
39 | MPP-175 |
Check status and proper functioning of the SPS BPM interlocks and their connection to the BIS SPS | BE-OP-SPS, K. Li | |
38 | MPP-174 |
The functional specifications for the new CO2 cooling safety system have to be written down, including the expected pressure increase and reaction time as well as the expected consequences and required switches and interlocks LHC | LHCb, TE-VSC | |
37 | MPP-174 |
Clarify who is using the beam mode UNSTABLE BEAMS and what implications it would have to remove it. If removed, it should be removed consistently in all the experiments LHC | BE-OP, J. Wenninger | |
36 | MPP-174 |
Review new movement control and interlocking logic/implementation in fourth quarter 2019 LHC | MPP, X. Pons, LHCb | |
35 | MPP-174 |
Clarify procedure for manual retraction of the VELO and for yearly testing of its functionality LHC | LHCb | |
32 | MPP-163 |
Prepare a summary slide to show which parameters are checked and how, referring to the AOB - Abort Gap Keeper - protection of fine delay parameter LHC | J. Wenninger | |
31 | MPP-161 |
The TDE pressure interlock should be masked with the new expert mode and unmasked when needed; the injection veto interlock will not be touched LHC | J. Wenninger | |
30 | MPP-161 |
Verify with MP3 if a SIS interlock on DFB temperature is required or if it is sufficient to take care of this via procedures LHC | MPP | |
29 | MPP-160 |
Send schematics of interlock to MPE to verify the interlock card and if re-testing is required LHC | A. Rossi | |
28 | MPP-157 |
Check on redundant powering of the LBDS (UPS test) LHC | TE-ABT | |
27 | MPP-157 |
Request from the impedance team an official statement on the use of the crystal chamber with ion physics beam LHC | Collimation | |
26 | MPP-157 |
Include into the BLM disabling rules a restriction for IPQs in LSS that BLMs in position 2 and 3 are not disabled at the same time LHC | E. B. Holzer | |
25 | MPP-156 |
Define use cases for the DOROS BPMs in IR7 collimators LHC | Collimation | |
24 | MPP-155 |
Operational scenarios and bunch intensities, beam types to be considered for the new BPMs electronics for IR6 LHC | BE-OP, MPP | |
23 | MPP-152 |
Verify the phase advances from the MKDs to the TCPs and how many bunches can escape the TCDQ if injected the abort gap LHC | SY-ABT, Collimation | |
21 | Verify expected beta beating at critical elements like TCTs or IR6 dump protection in case of a CLIQ mis-firing LHC | B. Lindstrom | ||
17 | MPP-145 |
Produce procedure to be performed after any change of the AGK length LHC | N. Magnin | 2021-06-01 |
15 | MPP-143 |
BCCM: Make post mortem data operational for BCCM and reduce BCCM trigger levels for all running sums during the beam commissioning to fully exploit the experience from loss maps etc. LHC | BE-BI | |
14 | MPP-139 |
Provide input to Christos concerning testing the BLM reaction time at 450 GeV and top energy in case of a RD1, RD34 powering failure LHC | MPP | |
12 | MPP-133 |
Verify which vacuum valves closed during the 2/9/16 MKI erratic LHC | TE-ABT | |
11 | MPP-133 |
Further understand the quench of Q2 during the 2/9/16 MKI erratic LHC | BLMTWG, MP3 | |
10 | MPP-125 |
Discuss how to check the status of the BCT buffer. Evaluate the new IQC module to see how often the SPS BCT buffers jump to zero LHC | M. Pojer | |
8 | MPP-119 |
Conduct systematic simulation studies on beam scraping by collimators in case of non-working dump LHC | M. Solfaroli, M. Valette | |
7 | MPP-119 |
Discuss the implementation of a passive beam presence flag LHC | M. Solfaroli, M. Valette | |
6 | MPP-118 |
Include cross-check of BIS self-triggering in BIS IPOC module LHC | I. Romera | 2021-05-31 |
5 | MPP-104 |
Discuss the final thresholds for collimators including BLM response between BLMTWG and the Collimation team LHC | A. Lechner, B. Salvachua | 2021-07-31 |
4 | MPP-101 |
Finalize a list of commissioning steps for the BCCM LHC | D. Belohrad | |
3 | MPP-98 |
Communicate flag to be surveyed by the LHC SIS for the remote surveillance of the VME and cPCI creates to Jorg and agree on testing LHC | N. Magnin, E. Carlier, J. Wenninger | |
2 | MPP-93 |
Calculate magnets damage limits at 450 GeV and 7 TeV LHC | Collimation, MPP |