MPWG 2001-7¶ 2001-10-05 Links¶ Indico¶ Minutes¶ EDMS¶ Topics and contributions¶ The connections of the powering and beam interlock systems (B. Puccio) SPS Interlocks in the LHC area (R. Giachino) Proposal for an inject & dump mode of operation (W. J.) Actions¶ No action for this meeting. Minutes¶