104th SPS and LHC Machine Protection Panel Meeting¶
2015-03-13
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
AOB-2: Strategy for disabling BLM monitors during run (B. Dehning, E. Holzer, E. Holzer)
-
AOB-1: Essential/Auxiliary circuits in PIC configuration (I. Romera Ramirez)
-
MPS commissioning status and ACCTEST (M. Zerlauth)
-
BLM thresholds for startup (B. Auchmann, M. Kalliokoski)
-
SPS East Extraction bump inhibit during COLDEX operation (R. Salemme)
-
AOB (J. Wenninger, M. Zerlauth)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
5 | Discuss the final thresholds for collimators including BLM response between BLMTWG and the Collimation team LHC | A. Lechner, B. Salvachua | 2021-07-31 |