MPP Workshop¶
2015-06-12
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Software interlock system + Real time FB (L. Ponce)
-
Beam Interlock System + Safe Machine Parameter System (S. Gabourin)
-
Collimation system (B. Salvachua Ferrando)
-
Post Mortem System (V. Chetvertkova)
-
Experience from operation 2015 (J. Wenninger)
-
ADT + AG cleaning (W. Hofle)
-
Introduction to the review (P. Collier)
-
Status of Powering Interlocks (I. Romera Ramirez)
-
Injection System (C. Bracco)
-
Beam Dumping System (J. Uythoven)
-
Beam position monitors (BPMS) +BSRA (T. Lefevre)
-
Beam loss monitoring (B. Dehning)
-
RF (P. Baudrenghien)
-
BCT for protection (L. Soby)
Actions¶
No action for this meeting.