124th SPS and LHC Machine Protection Panel Meeting¶
2016-04-08
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
AOB: Proposal for settings strategy for TOTEM XRP during high intensity fills (R. Bruce, S. Redaelli)
-
Summary of AFP commissioning results (M. Trzebinski)
-
Beam lost in TI2 due to undetected wrong current in TT60 bending - event analysis and proposed mitigations in SPS FEI - tbc (C. Mugnier, M. Magrans De Abril)
-
Impact of type 3 erratic on collimation - first results (R. Bruce)
-
New type of asynchronous beam dump with erratic on 3 MKDs (M. Fraser, W. Bartmann)
-
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
9 | Confirm number of extra bunches the IP7 collimators can take during a type 2 erratic and if this causes a problem LHC | R. Bruce |