146th SPS and LHC Machine Protection Panel Meeting¶
2017-04-28
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
MPP proposal for 2017 intensity ramp-up and update of intensity increase check list template (D. Wollmann)
-
Overview of MP system re-commissioning requirements with beam (M. Zerlauth)
-
AOB: ADT -AC-Dipole mode: machine protection tests during beam commissioning (B. Lindstrom)
-
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette)
-
Proposal for a new implementation of the Power Converter Beam Interlock System (D. Nisbet)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
18 | Study the feasibility of a variable window for PC interlocking LHC | TE-EPC |