Joint Meeting of the CollWG and the MPP¶
2017-06-09
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
AOB: Asynchronous dump with tighter TCTs (R. Bruce)
-
AOB: HV problem at BLMs R3 - observations and possible mitigations - TBC (C. Zamantzas)
-
60 A PP FGClite new failure cases and mitigation via SIS interlock (J. Wenninger)
-
60 A PP loss (08.05.), PIC server overload due to QPS OK filtering → robustness of mitigation (A. Antoine)
-
PC interlock status (D. Wollmann)
-
BPM interlock status and plans (A. Gorzawski)
-
DOROS BPM hardware status and plans for un-masking of the interlock (G. Baud, M. Gasior)
-
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette)
Actions¶
No action for this meeting.