149th SPS and LHC Machine Protection Panel Meeting¶
2017-06-23
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
AOB: Beam dump due to trip of the RQS.A81B1 circuit (16.06. 18:00) → circuit strengths and plans to interlock trip via PIC (A. Antoine, M. Valette)
-
Status of IQC and future development (M. Pojer)
-
ADT -AC-Dipole mode: results of parameter validation measurements (B. Lindstrom)
-
Simulation results of D1 / D34 powering failures for ATS optics and possible consequences on thresholds (M. Valette)
-
FMCM commissioning and first operational experience with new converters (A. Antoine)
-
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
19 | Review other failure cases for RD1 and estimate the associated FMCM signals LHC | TE-MPE-PE |