Skip to content

157th SPS and LHC Machine Protection Panel Meeting

2018-01-26

Indico

Minutes

EDMS

Topics and contributions

Actions

Description Responsible Deadline
28 Check on redundant powering of the LBDS (UPS test) LHC TE-ABT
27 Request from the impedance team an official statement on the use of the crystal chamber with ion physics beam LHC Collimation
26 Include into the BLM disabling rules a restriction for IPQs in LSS that BLMs in position 2 and 3 are not disabled at the same time LHC E. B. Holzer

Minutes