175th SPS and LHC Machine Protection Panel Meeting¶
2019-03-15
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
New DiDt interlock for SPS: planned technical implementation, thresholds and protection scenario (K. Li)
-
MPP Workshop: announcement and overview (M. Zerlauth)
-
AOB: all (D. Wollmann, J. Wenninger)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
40 | Evaluate and define damage limit for SPS beams, based on FLUKA studies if required. Provide the limit as input for BI SPS | BE-OP-SPS, K. Li | |
39 | Check status and proper functioning of the SPS BPM interlocks and their connection to the BIS SPS | BE-OP-SPS, K. Li |