Skip to content

175th SPS and LHC Machine Protection Panel Meeting

2019-03-15

Indico

Minutes

EDMS

Topics and contributions

Actions

Description Responsible Deadline
40 Evaluate and define damage limit for SPS beams, based on FLUKA studies if required. Provide the limit as input for BI SPS BE-OP-SPS, K. Li
39 Check status and proper functioning of the SPS BPM interlocks and their connection to the BIS SPS BE-OP-SPS, K. Li

Minutes