Skip to content

177th SPS and LHC Machine Protection Panel Meeting

2019-04-26

Indico

Minutes

EDMS

Topics and contributions

Actions

Description Responsible Deadline
47 Evaluate feasibility and implications with OP and CO to include an 'MD mask' level in the SIS LHC J. Wenninger, BE-OP
46 Include crystals into recovery sequences for Run 3 and integrate crystals into collimator fixed displays LHC S. Radaelli, BE-OP 2021-11-21
45 Specify line of responsibility for the BBCW temperature interlock for commissioning and operational follow-up LHC S. Radaelli, A. Rossi, BE-BI
44 Repeat response-time measurement with FGC2 system and report results in an AOB at the MPP LHC R. Mompo

Minutes