179th Machine Protection Panel Meeting (Injectors)¶
2019-07-05
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Management of Critical Settings for LINAC4 (A. Lombardi, B. Mikulec)
-
External Conditions: plans for LS2 (M. Hermo Serans)
-
Minutes, actions, organisation (J. Uythoven)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
128 | Evaluate how the masking of watchdog interlocks in the SIS can be only allowed for short pulse lengths Linac4 | B. Mikulec | 2021-04-30 |
76 | Organise pre-discussion on LINAC4 Caesiation Linac4 | J. Uythoven | |
75 | Check feasibility of implementing absolute watchdogs thresholds in hardware (i.e. lost number of particles/charges), which are not scaled with the pulse length Linac4 | B. Mikulec, F. Roncarolo | |
74 | Identify relevant locations and beam parameters for energy-deposition studies at LINAC4 Linac4 | B. Mikulec, A. Lechner, A. Lombardi | 2021-04-30 |
73 | Propose values for BLM hardware settings PSB | B. Mikulec | 2021-04-30 |
72 | Evaluate if there are additional aperture bottlenecks, where damage might lead to longer downtime than required for a bellow replacement Linac4 | A. Lombardi | 2021-04-30 |
71 | Evaluate best implementation to send automatic reminders of all active SIS masks for every shift PSB | B. Mikulec | 2021-04-30 |
70 | Check a) the possibility of using RBAC roles for the change of non-MCS settings and b) the feasibility of using the existing MCS framework, which automatically includes RBAC-role handling, to protect the virtual settings PSB | B. Mikulec | |
69 | Write down technical specifications and implementation for the signals migrated to the new timing-system functionality (PSB/PS) PSBPS | B. Mikulec | |
68 | Write down technical specifications and implementation (including list of concerned signals) for the consolidated External Conditions PSBPS | B. Schofield |