182nd Machine Protection Panel Meeting (Injectors)¶
2019-10-11
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
External conditions renovation status (M. Hermo Serans)
-
PSB: Injection into less than 4 rings (B. Mikulec)
-
Minutes from the 179th and 180th MPP meetings (C. Wiesner, J. Uythoven)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
83 | Define procedure under which circumstances and how to change the high-loss LINAC4 watchdog limits, including roll back to standard operation Linac4 | A. Lombardi | 2021-04-30 |
82 | Write procedure for injection into less than four PSB rings PSB | B. Mikulec | |
81 | Make proposal for the decision-taking process of masking critical interlock channels Linac4PSB | J. Uythoven | |
80 | Investigate and if possible implement the link between BIS and External Conditions. Otherwise, implement link via SIS Linac4PSB | B. Mikulec, G. Kruk | |
79 | Update the ECR on “PSB External Conditions for Post-LS2”, removing the WIC connection to the EC PSB | M. Serano | |
78 | Update the LINAC4/PSB specification of the BIS, replacing the input from the External Conditions LHC | C. Martin |