Description Responsible Deadline
104 Evaluate the potential gain and feasibility of evaluating the beam orbit at the collimator BPMs before starting the ramp-up of the BBLR wire current and issuing a warning if required LHC G. Sterbini, S. Radaelli, J. Wenninger
103 Evaluate together with the LPC the potential effect of BBCW operation on luminosity and luminous region LHC Y. Papaphilippou, G. Sterbini 2021-05-01
102 Update and circulate the procedure for “BBCW Commissioning and Revalidation after Failure Recovery” and then upload it on EDMS for approval LHC A. Rossi
101 Propose safe and reliable solution to force the BBCW user input to the WIC to TRUE in order to resume beam operation without BBCW LHC A. Rossi, R. Mompo
100 Confirm revalidation procedure for the BBCW after loss of collimator coolant LHC A. Rossi, M. Di Castro
99 Define required qualification tests for the BBCW after a TS and YETS LHC A. Rossi
98 Review the necessity to keep the existing SIS interlock on the BBCW PC current LHC A. Rossi, J. Wenninger 2021-05-01
97 Reassess the temperature load on the BPMs in both TCSP jaws in case of an asynchronous beam dump considering the worst-case (type 2) erratic LHC F. Carra, A. Lechner 2021-06-30
96 Update expected energy deposition based on the newest FLUKA studies for the case of an asynchronous beam dump and an injection error for the relevant collimator materials LHC F. Carra, A. Lechner 2021-06-30