195th Machine Protection Panel Meeting (LHC) - Joint meeting with CollWG¶
2020-10-16
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Strategy for crystal interlocking and operation in Run 3 (S. Redaelli)
-
Update on collimator BPM interlocks for Run 3 (M. Gasior, T. Levens)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
111 | Study the option of using the space in UJ76 during Run III LHC | M. Gasior, T. Levens | |
110 | Determine a strategy for P8 LHC | Collimation, R. Bruce | |
109 | Circulate a list of expected redundancies for run III LHC | Collimation, R. Bruce | |
108 | Check orbit at the crystal during injection failure LHC | Collimation | |
107 | Produce detailed operational scenarios and required validation for the use of the crystals LHC | Collimation | |
106 | Produce commissioning procedure for the crystals LHC | Collimation | |
105 | Check the angle change at the crystal during 10Hz orbit oscillations LHC | Collimation |