197th Machine Protection Panel Meeting (Injectors)¶
2020-11-13
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Conformity of BIS connection (C. Martin)
-
SPS injection bump for post-LS2 operation (F. Velotti)
-
Minutes and Actions (C. Wiesner, J. Uythoven)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
115 | Organize a discussion on the BIS GUI for the injectors PSB | J. Uythoven | |
114 | Circulate the information on the non-conformities to the MPP representatives for the different equipment LHC | J. Uythoven, D. Wollmann | |
113 | Verify how the connection has been done between POPS-B and BIS and describe the user input to BIS PSB | F. Boattini |