198th Machine Protection Panel Meeting (LHC)

2020-11-20

Indico

Minutes

EDMS

Topics and contributions

Actions

Description Responsible Deadline
133 Operation of LHCb velo at 450 GeV: Estimate the available aperture for a velo closing at 450 GeV in collaboration with optics and collimation teams and propose the measurement of the aperture in IP8 at injection before any physics operation at injection LHC V. Coco 2021-03-31
132 LHCb velo motion system: Implement signal from limit switches to the VSS LHC X. Pons 2021-03-31
131 LHCb velo motion system: Prepare a detailed procedure for manual movement and perform the procedure in full when the detector is installed with active control system to monitor the movement and avoid damage to the limit switches LHC V. Coco, F. Sanders 2021-03-31
130 LHCb velo motion system: Evaluate if a warning could be produced if the VELO alignment algorithm attempts to move one side beyond the 0 mm point LHC V. Coco 2021-03-31
129 LHCb velo motion system: Prepare a specifications document for the motion control, failures and interlocks LHC X. Pons 2021-03-31