205th Machine Protection Panel Meeting (LHC)¶
2021-03-26
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Re-commissioning of the vacuum system (G. Pigny)
-
MPS re-commissioning in the MPP: Overview (D. Wollmann)
-
AOB (C. Wiesner, D. Wollmann, J. Uythoven)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
137 | Coordinate with C.Martin (TE-MPE-MI) to verify CIBU connections of the vacuum system LHC | G. Pigny | |
136 | Validation of automatic script for the vacuum checkout tests LHC | G. Pigny |