209th Machine Protection Panel Meeting (LHC)¶
2021-05-21
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Re-commissioning of TOTEM/CTPPS (M. Deile)
-
Re-commissioning of the Collimation System (D. Mirarchi)
-
Follow-up of MPS re-commissioning via Checklist tool (C. Hernalsteens)
-
Re-commissioning of ARP (I. Lopez Paz)
-
AOB (C. Wiesner, D. Wollmann, J. Uythoven, M. Solfaroli Camillocci)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
152 | Add ARP interlock checks to the checklist based on previous EDMS documents LHC | C. Hernalsteens, I. Lopez | |
151 | Plan interlocks tests (basic interlock functionalities for each pot and comprehensive test in a dry run with changing beam modes and flags) LHC | BE-OP, M. Deile | |
150 | Add TOTEM/CTPPS interlock tests to the checklist LHC | C. Hernalsteens, M. Deile | |
149 | Discuss the handling of the redundant energy and beta* limits and propose possible improvements LHC | Collimation, BE-OP | |
148 | Circulate a list of people for check and approve the EDMS procedure LHC | C. Hernalsteens | |
147 | Give administrator access to MPP representatives and user access to the people who will fill in the results, verify with each system representative LHC | C. Hernalsteens |