213th Machine Protection Panel Meeting (Injectors)¶
2021-09-03
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Experience with the Linac4 RFQ breakdown protection and automatic recovery system (R. Wegner)
-
Protection of the Linac4 LEBT settings (R. Scrivens)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
166 | Study necessity and feasibility of special interlock configuration for LINAC4 3 MeV runs Linac4 | P. Skowronski | |
165 | Initiate study of alternative interlock configuration and failure diagnostics for Linac4 and possibly other injectors Linac4 | P. Skowronski | |
164 | Organise discussion about changing RF to HV as actuator for the source BIC and report back to the MPP Linac4 | D. Nisbet | |
163 | Update BIS specification (page 2) clarifying present and future situation wrt RF actuator Linac4PSB | C. Martin | |
162 | Update specifications “Logic for SIS Software Verification of LEBT Parameters” and send around for approval Linac4 | R. Scrivens |