218th Machine Protection Panel Meeting (Injectors)¶
2021-12-17
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Operational experience of Continuous Caesiation at Linac4 (J. Lallement)
-
Beam dump matrix modifications of the WIC in the PSB and PSB extraction lines (G. Di Giovanni)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
172 | Review the inconsistency that the WIC will not interlock the beam in case of a power converter failure, but still interlock the beam in case of a magnet failure PBS | G.P. Di Giovanni, MPP, D. Nisbet | |
171 | Update the ECR and circulate it for approval PBS | G.P. Di Giovanni |