220th Machine Protection Panel Meeting (LHC)¶
2022-03-18
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Status of MPS re-commissioning checklist (C. Hernalsteens)
-
Update of machine-protection checklists for intensity ramp-up and cruise (C. Wiesner)
-
Interlock strategies for LHC collimator temperatures and for TDE N2 pressure (M. Di Castro)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
177 | Analyze the changes to be made in the test procedure and study the consequences LHC | L. Roy, MPP | |
176 | Provide the list of disabled BIS channels to the MPP and inform the MPP once the channels are enabled again LHC | C. Martin | |
175 | Implement the publication through FESA of the additional signals (threshold values and measured value) and update the EDMS document LHC | M. Di Castro |