224th Machine Protection Panel Meeting (LHC) - Joint meeting with CollWG¶
2022-04-29
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Orbit analysis, proposal for 2022 BPM interlock settings and staging (B. Lindstrom)
-
BPM interlock implementation (J. Wenninger)
-
Considerations on BSRTM aperture and operational settings (R. De Maria, R. Bruce)
-
In-jaw beam-beam wire commissioning procedure and schedule (A. Rossi)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
186 | Follow -up on the delay of the beam dumped event sent out over the timing system LHC | G. Kruk | |
185 | Install a BLM close to the BSRTMB in IR4 during the YETS LHC | B. Salvachua | |
184 | Define the list of required loss maps for critical scenario LHC | BE-OP, Collimation | |
183 | Define and organize a test with beam to confirm that the beam is not affected in case of an abort of the wire power converter during the timeframe of the interlock reaction time of the WIC and BIS LHC | BE-OP, BE-ABP |