228th Machine Protection Panel Meeting (LHC)¶
2022-07-01
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Readiness of Machine Protection and related systems for stable beams with 3-12 bunches at 6.8 TeV (B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Kotzian, G. Pigny, G. Sterbini, J. Uythoven, J. Wenninger, M. Trzebinski, M. Deile, M. Soderen, M. Saccani, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
181 | Perform all BBWC tests to allow the powering of the wires during the ramp-up once the software is ready LHC | G. Sterbini |