229th Machine Protection Panel Meeting (LHC)¶
2022-07-15
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
FRAS risk analysis and risk mitigation using Protection Layers, according to the IEC 61511 standard (B. Fernandez Adiego)
-
Introduction to Full Remote Alignment System and initial study of FRAS operation failure modes (M. Sosin)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
180 | By the end of the year inputs for potential additional interlocks or hardware stops for the protections of components in the FRAS must be provided by the relevant teams and collected for the FRAS specifications LHC | F.-X. Nury | |
179 | Prepare detailed specifications for the interlocks, including the FRAS key in CCR and the newly discussed “FRAS powering interlock” to a maskable input of the CIBUs in IR1 and 5 LHC | FRAS, MPP |