231st Machine Protection Panel Meeting (LHC/Injectors)¶
2022-11-25
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Hardware transmission of DC-BCT intensity to SMP SPS and LHC (T. Levens)
-
SMP modifications and their implications during YETS 2022-2023 (R. Secondo)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
193 | Draft ECR on the proposed DC-BCT and SMP changes for the SPS LHC | T. Levens, R. Secondo |