234th Machine Protection Panel Meeting (LHC)¶
2023-03-24
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
ALFA/AFP (M. Milovanovic)
-
ADT (D. Valuch)
-
Collimation (D. Mirarchi)
-
Injection & LBDS (Y. Dutheil)
-
Beam Loss Monitor system (M. Saccani)
-
BIC, PIC, WIC, FMCM, SMP (R. Secondo)
-
Change of injection optics with phase advance knob (F. Van Der Veken, K. Paraschou)
-
2023 machine revalidation strategy (F. Van Der Veken)
-
Vacuum System (G. Pigny)
-
Proposal for 2023 intensity ramp-up (C. Wiesner)
-
TOTEM/CT-PPS (M. Deile)
-
SIS (J. Wenninger)
-
Minutes and actions (D. Wollmann)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
204 | Define the filling schemes corresponding to each intensity step LHC | C. Wiesner, F. Moortgat | |
203 | Determine the interlock level for the TCT BPMs for the 2023 configuration LHC | BE-OP, Collimation | |
202 | Define the optics steps at which the measurements will take place and agree with OP for a slot to perform them LHC | BE-OP, C. Hernalsteens |