242nd Machine Protection Panel Meeting (LHC)¶
2023-12-15
Links¶
Indico¶
Minutes¶
EDMS¶
Topics and contributions¶
-
Implications of the BISv2 design for the LBDS (N. Voumard, P. Van Trappen)
-
AOB: Installation of additional BLMs and replacement of 6 SEMs by LICs in the collimation region (B. Salvachua Ferrando, C. Zamantzas)
-
BIS v2 and change of the actuator interface (I. Romera Ramirez)
Actions¶
Description | Responsible | Deadline | |
---|---|---|---|
216 | Report to the MPP regarding the decision on the TSU renovation and the outcomeof the reliability analysis or the new interface between BIS and TSU LHC | N. Voumard, P. Van Trappen | |
215 | Report on the first experience with beam regarding the reduced sensitivity of the newly installed BLMs and propose the interlocking strategy for the 2024 run LHC | B. Salvachua |