Past topics¶ 2018¶ Reference Title Tags Links MPP-157 PIC/WIC/FMCM YETS activities & Re-commissioning plans (A. Antoine) lhc-revalidation 2017¶ Reference Title Tags Links MPP-155 Configuration change of PIC to interlock all RQS circuits (A. Antoine) pic MPP-149 AOB: Beam dump due to trip of the RQS.A81B1 circuit (16.06. 18:00) → circuit strengths and plans to interlock trip via PIC (A. Antoine, M. Valette) pic MPP-149 FMCM commissioning and first operational experience with new converters (A. Antoine) fmcm 60 A PP loss (08.05.), PIC server overload due to QPS OK filtering → robustness of mitigation (A. Antoine) pic MPP-142 PIC: Summary of changes and re-commissioning after EYETS (A. Antoine) lhc-revalidationpic