Past topics¶
2024¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-246 |
BETS TCDQ upgrade | tcdq |
2023¶
Reference | Title | Tags | Links |
---|---|---|---|
rMPP | Injection protection and LBDS |
2022¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-226 |
Readiness of Machine Protection and related systems for a full machine at injection (scrubbing) and things open before taking a 12 bunch train up to top energy. | stable-beams-readiness | |
MPP-223 |
Status of MP system commissioning before first beam | stable-beams-readiness |
2021¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-214 |
Status MP system commissioning before first injection of a nominal bunch | stable-beams-readiness |
2020¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-187 |
MKB changes: impact on dilution pattern | lbds | |
MPP-187 |
TL steering with full train and bunch intensity interlock for LBDS intercepting devices | lhc-injectionlbds |
2019¶
Reference | Title | Tags | Links |
---|---|---|---|
Workshop | LBDS - system overview |
2018¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-171 |
Summary and conclusion from asynchronous dump tests after TS2 | ||
MPP-168 |
AOB: Required revalidation after TS2: loss maps, asynchronous dump tests, intensity ramp-up etc | lhc-revalidation | |
MPP-158 |
MPS re-commissioning after YETS 2017/18 - Injection Protection / LBDS | lhc-revalidation |
2017¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-143 |
Injection Protection: Summary of changes and re-commissioning after EYETS | lhc-injection | |
MPP-143 |
LBDS: Summary of changes and re-commissioning after EYETS (C. Bracco, W. Bartmann) |
lbds |
2015¶
Reference | Title | Tags | Links |
---|---|---|---|
rMPP | MD 290: Q4 (IP6) quench levels | ||
MPP-119 |
LBDS: asynchronous dump recovery procedure (loss distribution between TCDQ-TCSG) | lbds | |
Workshop | Injection System | lhc-injection | |
MPP-106 |
LBDS summary of commissioning results (C. Bracco, W. Bartmann) |
lbds | |
MPP-106 |
Injection summary of commissioning results | lhc-injection | |
MPP-105 |
Round table discussion on MPS commissioning status | lhc-revalidation |
2014¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-98 |
AOB - BLM update at MKI (C. Bracco) |
||
MPP-95 |
New ALICE beam chamber - injection failures and n1 calculations | lhc-aperture | |
MPP-88 |
Re-commissioning procedures LBDS (C. Bracco) |
lbds |
2012¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-67 |
Conclusions after TDI issue in Pt8 and Reminder on MKI and MKE interlock depending on TDI position as preparation for 25ns scrubbing run | lhc-injection |