Skip to content

Past topics

2024

Reference Title Tags Links
MPP-246
BETS TCDQ upgrade
(C. Bracco)
tcdq

2023

Reference Title Tags Links
rMPP Injection protection and LBDS
(C. Bracco, Y. Dutheil)

2022

Reference Title Tags Links
MPP-226
Readiness of Machine Protection and related systems for a full machine at injection (scrubbing) and things open before taking a 12 bunch train up to top energy.
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Kotzian, G. Pigny, J. Uythoven, J. Wenninger, M. Trzebinski, M. Deile, M. Soderen, M. Saccani, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness
MPP-223
Status of MP system commissioning before first beam
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Kotzian, G. Pigny, J. Uythoven, J. Wenninger, M. Trzebinski, M. Deile, M. Soderen, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness

2021

Reference Title Tags Links
MPP-214
Status MP system commissioning before first injection of a nominal bunch
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Pigny, J. Uythoven, J. Wenninger, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness

2020

Reference Title Tags Links
MPP-187
MKB changes: impact on dilution pattern
(C. Bracco, Y. Dutheil)
lbds
MPP-187
TL steering with full train and bunch intensity interlock for LBDS intercepting devices
(C. Bracco)
lhc-injectionlbds

2019

Reference Title Tags Links
Workshop LBDS - system overview
(C. Bracco)

2018

Reference Title Tags Links
MPP-171
Summary and conclusion from asynchronous dump tests after TS2
(C. Bracco, W. Bartmann)
MPP-168
AOB: Required revalidation after TS2: loss maps, asynchronous dump tests, intensity ramp-up etc
(C. Bracco, D. Wollmann, J. Uythoven, R. Bruce, S. Redaelli)
lhc-revalidation
MPP-158
MPS re-commissioning after YETS 2017/18 - Injection Protection / LBDS
(C. Bracco)
lhc-revalidation

2017

Reference Title Tags Links
MPP-143
Injection Protection: Summary of changes and re-commissioning after EYETS
(C. Bracco, W. Bartmann)
lhc-injection
MPP-143
LBDS: Summary of changes and re-commissioning after EYETS
(C. Bracco, W. Bartmann)
lbds

2015

Reference Title Tags Links
rMPP MD 290: Q4 (IP6) quench levels
(C. Bracco, M. Bednarek)
MPP-119
LBDS: asynchronous dump recovery procedure (loss distribution between TCDQ-TCSG)
(C. Bracco)
lbds
Workshop Injection System
(C. Bracco)
lhc-injection
MPP-106
LBDS summary of commissioning results
(C. Bracco, W. Bartmann)
lbds
MPP-106
Injection summary of commissioning results
(C. Bracco, W. Bartmann)
lhc-injection
MPP-105
Round table discussion on MPS commissioning status
(C. Bracco, C. Martin, C. Zamantzas, E. Holzer, E. Holzer, G. Valentino, G. Pigny, I. Romera Ramirez, J. Uythoven, J. Wenninger, M. Zerlauth, S. Gabourin, W. Bartmann)
lhc-revalidation

2014

Reference Title Tags Links
MPP-98
AOB - BLM update at MKI
(C. Bracco)
MPP-95
New ALICE beam chamber - injection failures and n1 calculations
(C. Bracco)
lhc-aperture
MPP-88
Re-commissioning procedures LBDS
(C. Bracco)
lbds

2012

Reference Title Tags Links
MPP-67
Conclusions after TDI issue in Pt8 and Reminder on MKI and MKE interlock depending on TDI position as preparation for 25ns scrubbing run
(C. Bracco)
lhc-injection