Past topics¶
2020¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-201 |
Crystal installation at SPS: Operational scenarios and failures cases | sps |
2018¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-167 |
Slow extraction MD in the SPS using octupoles to manipulate the shape of the extracted separatrix in phase space | sps |
2017¶
Reference | Title | Tags | Links |
---|---|---|---|
rMPP | Implementation of a dynamic extraction bump in LSS2 |
2016¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-126 |
Thresholds for BSRA (abort gap population) and automated beam dump by SIS | sis | |
MPP-124 |
New type of asynchronous beam dump with erratic on 3 MKDs | asdlbds |