Past topics¶
2018¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-157 |
BLM disabling rules - final implementation | blm-thresholds |
2015¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-113 |
BLM threshold increase for TOTEM roman pots | blm-thresholdslhc-xrp | |
MPP-112 |
Direct BLM interlock tests | lbdsblm-hardware | |
MPP-108 |
BLM disabling rules + special classification of BLMs (E. Holzer) |
blm-software | |
MPP-105 |
Proposal of monitor factors to be applied in injection region | blm-thresholds | |
MPP-105 |
Proposal of run2-configuration for maskable/un-maskable BLMs | blm-software | |
MPP-105 |
Round table discussion on MPS commissioning status | lhc-revalidation | |
MPP-104 |
AOB-2: Strategy for disabling BLM monitors during run (B. Dehning, E. Holzer, E. Holzer) |
blm-software | |
MPP-102 |
Failing of BLMs in Inner triplets - proposed update of BLM disabling rules for inner triplet monitors | blm-software |
2014¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-99 |
ECR for injection BLMs | blm-hardware | |
MPP-97 |
Re-commissioning procedures for BLM system | blm-software |
2013¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-84 |
Summary of planned changes of BLMs in the Injection regions (left of IP2, right of IP8) | blm-softwareblm-thresholds | |
MPP-83 |
New rules for disabling of BLMs | blm-software | |
MPP-77 |
Injection region BLMs – left IP2: Suggestion of changes | blm-hardwareblm-software |
2011¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-52 |
Limiting BLM monitors – What could be gained without sunglasses | blm-hardware | |
MPP-45 |
Status of direct BLMs in IR6 – first measurements and outlook for connection to LBDS | lbds | |
MPP-43 |
Calculation of direct dump IC monitor thresholds | lbdsblm-thresholds | |
MPP-43 |
Direct BLMs to LBDS - Proposed system setup, thresholds and LBDS connection | lbds |
2010¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-29 |
Thresholds for BLMs with RF filters | blm-thresholds | |
MPP-22 |
Proposed changes to BLM system | blm-softwareblm-hardware |
2009¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-15 |
BLMs for empty cryostat | blm-hardware | |
MPP-14 |
BLM audit sequel | blm-software | |
MPP-14 |
BLM software procedures | blm-software | |
MPP-10 |
BLM specification comments | blm-hardwareblm-software |
2004¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Location of beam loss monitors | blm-hardware |