Past topics¶
2021¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-208 |
Commissioning procedure for SPS injection tests with new MDSH functionality | sps |
2019¶
Reference | Title | Tags | Links |
---|---|---|---|
Feedback from SPS Operation | smp | ||
Workshop | SPS HW changes for LIU beams (V. Kain) |
2018¶
2017¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-151 |
Functional Specifications for the TED interlocking for LIU beams | ted |
2016¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-120 |
Change of SPS extraction interlock strategy for LIU beams | sps |
2015¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-106 |
IQC - status, implemented changes (PM data sets, thresholds, ... ) and planned upgrades | post-mortem |
2012¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-68 |
SPS: Fast extraction from LSS2, using the injection kickers in LSS1 - MD Results | sps |
2011¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-52 |
Injection losses vs Operational Availability | lhc-injection |
2009¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-11 |
MKI test mode | lhc-injection | |
MPP-9 |
Summary BLM trim and MCS tests | blm-software |
2007¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | SPS Extraction Interlocks | sps |
2006¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Extraction studies for CNGS | sps |
2005¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Management of Critical Settings MCS | ||
MPWG | Management of Critical Settings (postponed) | ||
MPWG | Requirements for a Fast Magnet Current Change Monitor | fmcm |
2003¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | AOB : Beam impact on collimator in the transfer line | ||
MPWG | Check of D1 failure simulations with MADX and aperture model of IR1 | fast-failurepowering |
2002¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Fast beam losses due to equipment failures [ps] | fast-failure |