Past topics¶
2019¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-184 |
Recent PSB radiation alarm during LINAC4 LBE run: post-mortem analysis and actions | psblinac4 | |
MPP-180 |
Aim and context of meeting | linac4 | |
| Workshop | Linac 4 - experience and open points |
2017¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-146 |
Proposal for a new implementation of the Power Converter Beam Interlock System |
2016¶
| Reference | Title | Tags | Links |
|---|---|---|---|
| Welcome and goals of review | linac4 | ||
| L4 Power converters and switching magnet acquisition cards: Configurations and interlock logic | linac4 | ||
| Wrap-up (D. Nisbet, M. Zerlauth) |
|||
MPP-123 |
Linac 4 commissioning with 100MeV MPS aspects | linac4 |
2015¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-117 |
Linac4 commissioning, experience, status and strategy | linac4 |