Past topics¶
2024¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-246 |
Readiness for first Stable Beams (A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, F. Van Der Veken, G. Pigny, I. Romera Ramirez, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil) |
stable-beams-readiness |
2023¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-242 |
BIS v2 and change of the actuator interface | bis |
2020¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-186 |
Interlocking of the SPS MDSH injection bumper | sps |
2019¶
Reference | Title | Tags | Links |
---|---|---|---|
Overview of the present SMP System | smp | ||
Workshop | Interlock systems |
2018¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-159 |
MPS re-commissioning after YETS 2017/18: BIS/SMP | lhc-revalidation |
2017¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-142 |
FMCM: Summary of changes and re-commissioning after EYETS | lhc-revalidationfmcm | |
MPP-142 |
SMP: Summary of changes and re-commissioning after EYETS | lhc-revalidationsmp | |
MPP-141 |
24bit ADC DCBCTs for the LHC and SPS, redundant intensity signals in the SPS | sps-dcbct |
2015¶
Reference | Title | Tags | Links |
---|---|---|---|
Workshop | Status of Powering Interlocks | pic | |
MPP-106 |
PIC/FMCM/WIC summary of commissioning results | picfmcmwic | |
MPP-105 |
Round table discussion on MPS commissioning status | lhc-revalidation | |
MPP-104 |
AOB-1: Essential/Auxiliary circuits in PIC configuration | pic |
2014¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-87 |
PIC configuration (maskable/unmaskable circuits) | pic | |
MPP-86 |
Conclusions for UPS powering test and procedure. | ups | |
MPP-85 |
Update of (Re-)Commissioning procedures for PIC, FMCM, BIS, ... | picfmcmbis |
2013¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-82 |
UPS powering tests | ups | |
Workshop | Changes in powering interlocks | ||
MPP-75 |
PP60A vs beam dumps + Changes of MPS systems during LS1 | pic |
2012¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-63 |
Analysis and follow-up of recent converter trip of RTQX2.L2-15.06.2012 | powering |
2010¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-36 |
PIC, WIC and FMCM re-commissioning for 2011 | picwicfmcm |