Skip to content

Past topics

2024

Reference Title Tags Links
MPP-246
Readiness for first Stable Beams
(A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, F. Van Der Veken, G. Pigny, I. Romera Ramirez, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil)
stable-beams-readiness

2023

Reference Title Tags Links
MPP-242
BIS v2 and change of the actuator interface
(I. Romera Ramirez)
bis

2020

Reference Title Tags Links
MPP-186
Interlocking of the SPS MDSH injection bumper
(F. Velotti, I. Romera Ramirez)
sps

2019

Reference Title Tags Links
Overview of the present SMP System
(I. Romera Ramirez)
smp
Workshop Interlock systems
(I. Romera Ramirez)

2018

Reference Title Tags Links
MPP-159
MPS re-commissioning after YETS 2017/18: BIS/SMP
(I. Romera Ramirez, R. Secondo)
lhc-revalidation

2017

Reference Title Tags Links
MPP-142
FMCM: Summary of changes and re-commissioning after EYETS
(I. Romera Ramirez)
lhc-revalidationfmcm
MPP-142
SMP: Summary of changes and re-commissioning after EYETS
(I. Romera Ramirez)
lhc-revalidationsmp
MPP-141
24bit ADC DCBCTs for the LHC and SPS, redundant intensity signals in the SPS
(I. Romera Ramirez, P. Odier, S. Gabourin)
sps-dcbct

2015

Reference Title Tags Links
Workshop Status of Powering Interlocks
(I. Romera Ramirez)
pic
MPP-106
PIC/FMCM/WIC summary of commissioning results
(I. Romera Ramirez)
picfmcmwic
MPP-105
Round table discussion on MPS commissioning status
(C. Bracco, C. Martin, C. Zamantzas, E. Holzer, E. Holzer, G. Valentino, G. Pigny, I. Romera Ramirez, J. Uythoven, J. Wenninger, M. Zerlauth, S. Gabourin, W. Bartmann)
lhc-revalidation
MPP-104
AOB-1: Essential/Auxiliary circuits in PIC configuration
(I. Romera Ramirez)
pic

2014

Reference Title Tags Links
MPP-87
PIC configuration (maskable/unmaskable circuits)
(I. Romera Ramirez)
pic
MPP-86
Conclusions for UPS powering test and procedure.
(I. Romera Ramirez)
ups
MPP-85
Update of (Re-)Commissioning procedures for PIC, FMCM, BIS, ...
(I. Romera Ramirez)
picfmcmbis

2013

Reference Title Tags Links
MPP-82
UPS powering tests
(I. Romera Ramirez, M. Zerlauth, V. Chareyre)
ups
Workshop Changes in powering interlocks
(I. Romera Ramirez)
MPP-75
PP60A vs beam dumps + Changes of MPS systems during LS1
(I. Romera Ramirez)
pic

2012

Reference Title Tags Links
MPP-63
Analysis and follow-up of recent converter trip of RTQX2.L2-15.06.2012
(H. Thiesen, I. Romera Ramirez)
powering

2010

Reference Title Tags Links
MPP-36
PIC, WIC and FMCM re-commissioning for 2011
(I. Romera Ramirez)
picwicfmcm