Past topics¶
2024¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-253 |
Update on BBCW status and plans | bbcw | |
MPP-251 |
Planned adjustment of the temperature interlock of the BBCW | bbcw | |
| rMPP | Temperature interlock | bbcw |
2022¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-224 COLLWG |
In-jaw beam-beam wire commissioning procedure and schedule | bbcw |
2020¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-193 |
Machine-protection aspects of BBLR operation in Run 3 | bbcw |
2018¶
2017¶
| Reference | Title | Tags | Links |
|---|---|---|---|
| rMPP | Long range and wire collimator | ||
MPP-144 |
AOB: Beam Beam wire compensator: final implementation of wire temperature interlock | bbcw |
2016¶
2011¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-43 |
MP test for collimators | collimation |