2024

Reference Title Tags Links
MPP-247
COLLWG
Displaced BLMs in IR7 - Thresholds, response, sensitivity and first experience during scrubbing and the intensity ramp-up
(B. Salvachua Ferrando, C. Zamantzas, S. Morales Vigo)
blm-thresholdsblm-ir7
MPP-246
Readiness for first Stable Beams
(A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, F. Van Der Veken, G. Pigny, I. Romera Ramirez, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil)
stable-beams-readiness
MPP-245
First experience with beam regarding the reduced sensitivity of the newly installed BLMs
(B. Salvachua Ferrando)
blm-thresholdsblm-ir7
MPP-244
Readiness for first beam
(A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, G. Pigny, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil)
stable-beams-readiness

2023

Reference Title Tags Links
MPP-242
AOB: Installation of additional BLMs and replacement of 6 SEMs by LICs in the collimation region
(B. Salvachua Ferrando, C. Zamantzas)
blm-ir7
rMPP Beam Loss Monitor system
(B. Salvachua Ferrando, C. Zamantzas)

2022

Reference Title Tags Links
rMPP Change of BLM thresholds for MD7224
(A. Lechner, B. Salvachua Ferrando)
MPP-226
Readiness of Machine Protection and related systems for a full machine at injection (scrubbing) and things open before taking a 12 bunch train up to top energy.
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Kotzian, G. Pigny, J. Uythoven, J. Wenninger, M. Trzebinski, M. Deile, M. Soderen, M. Saccani, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness
rMPP MD6949: Validation of bunch-by-bunch diamond detectors functionalities
(B. Salvachua Ferrando, S. Morales Vigo)
MPP-223
Status of MP system commissioning before first beam
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Kotzian, G. Pigny, J. Uythoven, J. Wenninger, M. Trzebinski, M. Deile, M. Soderen, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness
MPP-221
BLM thresholds changes for Run3
(B. Salvachua Ferrando)
blm-thresholds

2021

Reference Title Tags Links
MPP-214
Status MP system commissioning before first injection of a nominal bunch
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Pigny, J. Uythoven, J. Wenninger, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness
MPP-212
Status of BLM testing with TIM and proposal for sub-set of tested BLMs before the pilot beam test
(B. Salvachua Ferrando, C. Zamantzas)
blm-hardware
MPP-207
BLM System: Summary of the major installation changes & TIM development
(B. Salvachua Ferrando)
blm-hardwareblm-software

2018

Reference Title Tags Links
MPP-160
MPS re-commissioning after YETs 2017/18: Collimation
(B. Salvachua Ferrando)
lhc-revalidationcollimation

2017

Reference Title Tags Links
rMPP BTF & Landau damping
(B. Salvachua Ferrando, C. Tambasco, R. Bruce, T. Pieloni, X. Buffat)

2015

Reference Title Tags Links
rMPP MD 340: Collimation quench test
(A. Mereghetti, B. Salvachua Ferrando)
MPP-115
Collimating qualification needs after TS
(B. Salvachua Ferrando)
collimation
Workshop Collimation system
(B. Salvachua Ferrando)
collimation
MPP-102
Roman pot settings during low and high beta* runs for run2
(B. Salvachua Ferrando)
lhc-xrp

2014

Reference Title Tags Links
MPP-94
Re-commissioning procedures for LHC Collimation
(B. Salvachua Ferrando)
collimation

2013

Reference Title Tags Links
Workshop Beam-based validation of settings
(B. Salvachua Ferrando)