Skip to content

Past topics

2024

Reference Title Tags Links
MPP-246
Readiness for first Stable Beams
(A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, F. Van Der Veken, G. Pigny, I. Romera Ramirez, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil)
stable-beams-readiness
MPP-244
Readiness for first beam
(A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, G. Pigny, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil)
stable-beams-readiness

2023

Reference Title Tags Links
MPP-240
New BCT5 Connection to the SPS-SMP and Implications for the YETS 2023-24
(R. Secondo, T. Levens)
smp
MPP-234
BIC, PIC, WIC, FMCM, SMP
(R. Secondo)
stable-beams-readiness

2022

Reference Title Tags Links
MPP-231
SMP modifications and their implications during YETS 2022-2023
(R. Secondo)
smp
MPP-226
Readiness of Machine Protection and related systems for a full machine at injection (scrubbing) and things open before taking a 12 bunch train up to top energy.
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Kotzian, G. Pigny, J. Uythoven, J. Wenninger, M. Trzebinski, M. Deile, M. Soderen, M. Saccani, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness
MPP-223
Status of MP system commissioning before first beam
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Kotzian, G. Pigny, J. Uythoven, J. Wenninger, M. Trzebinski, M. Deile, M. Soderen, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness

2021

Reference Title Tags Links
MPP-214
Status MP system commissioning before first injection of a nominal bunch
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Pigny, J. Uythoven, J. Wenninger, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness
MPP-204
Re-commissioning of the interlock systems BIS, SMP, WIC, PIC and FMCM
(R. Secondo)
lhc-interlocks

2020

Reference Title Tags Links
MPP-189
SPS extraction interlock: doubling the SMP connection
(R. Secondo)
sps

2019

Reference Title Tags Links
SMP v2 Hardware Implementation and Timeline
(R. Secondo)
smp

2018

Reference Title Tags Links
MPP-159
MPS re-commissioning after YETS 2017/18: BIS/SMP
(I. Romera Ramirez, R. Secondo)
lhc-revalidation