Past topics¶
2024¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-246 |
Readiness for first Stable Beams (A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, F. Van Der Veken, G. Pigny, I. Romera Ramirez, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil) |
stable-beams-readiness | |
MPP-244 |
Readiness for first beam (A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, G. Pigny, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil) |
stable-beams-readiness |
2023¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-240 |
New BCT5 Connection to the SPS-SMP and Implications for the YETS 2023-24 | smp | |
MPP-234 |
BIC, PIC, WIC, FMCM, SMP | stable-beams-readiness |
2022¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-231 |
SMP modifications and their implications during YETS 2022-2023 | smp | |
MPP-226 |
Readiness of Machine Protection and related systems for a full machine at injection (scrubbing) and things open before taking a 12 bunch train up to top energy. | stable-beams-readiness | |
MPP-223 |
Status of MP system commissioning before first beam | stable-beams-readiness |
2021¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-214 |
Status MP system commissioning before first injection of a nominal bunch | stable-beams-readiness | |
MPP-204 |
Re-commissioning of the interlock systems BIS, SMP, WIC, PIC and FMCM | lhc-interlocks |
2020¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-189 |
SPS extraction interlock: doubling the SMP connection | sps |
2019¶
Reference | Title | Tags | Links |
---|---|---|---|
SMP v2 Hardware Implementation and Timeline | smp |
2018¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-159 |
MPS re-commissioning after YETS 2017/18: BIS/SMP | lhc-revalidation |