Past topics¶
2024¶
Reference | Title | Tags | Links |
---|---|---|---|
rMPP | Results of validation fill for MD12663 | ||
rMPP | Results of validation fill for MD12663 (F. Van Der Veken, G. Sterbini, Y. Dutheil) |
||
rMPP | MD12663: Wire compensation during the beta*-leveling | ||
rMPP | MDs: Non-Factorization/VdM (A. Fornara, E. Lamb, G. Sterbini) |
||
rMPP | Summary of measurements and WIC event (G. Sterbini) |
bbcw | |
MPP-246 |
BBWC commissioning and operation for 2024 | bbcw |
2023¶
Reference | Title | Tags | Links |
---|---|---|---|
rMPP | MD10703: Ions BB limit varying the crossing angles | ||
rMPP | MD9407: Noise spectrum and emittance growth with different ADT gain |
2022¶
Reference | Title | Tags | Links |
---|---|---|---|
rMPP | MD8043: Beam-beam wire compensation |
2018¶
Reference | Title | Tags | Links |
---|---|---|---|
rMPP | MD3263 LR beam-beam compensation using DC wires | ||
rMPP | MD 3583: LR beam-beam 2018 | ||
rMPP | MD 3263 - LR beam-beam compensation using DC wires (2018) |
2017¶
Reference | Title | Tags | Links |
---|---|---|---|
rMPP | Long range and wire collimator |