Skip to content

Past topics

2013

Reference Title Tags Links
Workshop Performance and availability of MPS 2008-2012
(B. Todd)

2012

Reference Title Tags Links
MPP-61
Implementation and first experience with SMP cross-checker
(B. Todd)
smp

2011

Reference Title Tags Links
MPP-53
SMP<->GMT transmission cross-check
(B. Todd)
smp
MPP-46
Beam Presence Flag Changes- TS#3
(B. Todd)
smp
MPP-40
SMP 3v0
(B. Todd)
smp

2010

Reference Title Tags Links
MPP-36
SMP re-commissioning for 2011
(B. Todd)
smp
MPP-26
Beam Presence Flag filter
(B. Todd)
smp
MPP-25
SMP beam flag 1A event
(B. Todd)
smp
MPP-23
SMP status and plans
(B. Todd)
smp

2009

Reference Title Tags Links
MPP-19
External review of the BIS
(B. Todd)
bis
MPP-19
SMP issues
(B. Todd)
smp
MPP-16
Flexible energy windows for SMP
(B. Todd)
smp

2008

Reference Title Tags Links
MPP-6
CIBU connection review
(B. Todd, B. Puccio)
bis
MPP-2
SMP update
(B. Todd)
smp

2007

Reference Title Tags Links
MPWG Experiment Injection Interlocks
(B. Todd)
lhc-experiment

2006

Reference Title Tags Links
MPWG Results of EMC tests for Beam Interlock System hardware
(B. Todd)
bis

2005

Reference Title Tags Links
MPWG Commissioning of the beam interlock system
(B. Todd)
bis
MPWG Reliability of the interlock system
(B. Todd)
bis