Past topics¶
2024¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-246 |
Readiness for first Stable Beams (A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, F. Van Der Veken, G. Pigny, I. Romera Ramirez, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil) |
stable-beams-readiness | |
MPP-244 |
Readiness for first beam (A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, G. Pigny, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil) |
stable-beams-readiness | |
MPP-243 |
SIS updates and TDI-TCDI interlocks | sistdis |
2023¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-237 |
BPM calibration issue, systematic orbit shifts and proposal for mitigation after TS1 | lhc-bpm | |
MPP-234 |
SIS (J. Wenninger) |
stable-beams-readiness |
2022¶
2021¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-214 |
Status MP system commissioning before first injection of a nominal bunch | stable-beams-readiness | |
MPP-210 |
Machine protection requirements for the pilot beam test | stable-beams-readiness | |
MPP-207 |
Re-commissioning of the Software Interlock System | sis |
2020¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-191 |
Status of IQC and future development | post-mortem |
2019¶
Reference | Title | Tags | Links |
---|---|---|---|
AOB - all (D. Wollmann, J. Wenninger) |
|||
MPP-185 |
Proposal for orbit interlocking in Run3 | sis | |
MPP-185 |
AOB - all (D. Wollmann, J. Wenninger) |
||
MPP-183 |
AOB - all | ||
MPP-181 |
New beta* reconstruction for run3 | smp | |
MPP-181 |
AOB - all (D. Wollmann, J. Wenninger) |
||
MPP-181 |
Follow-ups from MPP workshop | ||
Feedback from LHC Operation | smp | ||
Workshop | SIS, beta PCinterlock | ||
MPP-177 |
AOB - all (D. Wollmann, J. Wenninger) |
||
MPP-176 |
AOB- all (D. Wollmann, J. Wenninger) |
||
MPP-175 |
AOB: all (D. Wollmann, J. Wenninger) |
||
MPP-174 |
AOB: all (D. Wollmann, J. Wenninger) |
2018¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-173 |
AOB: all (D. Wollmann, J. Wenninger) |
||
MPP-172 |
AOB: all (D. Wollmann, J. Wenninger) |
||
MPP-171 |
MPP proposal for Pb-Pb intensity ramp-up | ion-runintensity-ramp-up | |
MPP-171 |
AOB: all (D. Wollmann, J. Wenninger) |
||
MPP-170 |
AOB: all (D. Wollmann, J. Wenninger) |
||
MPP-169 |
AOB: all (D. Wollmann, J. Wenninger) |
||
MPP-168 |
AOB: all (D. Wollmann, J. Wenninger) |
||
MPP-167 |
AOB: all (D. Wollmann, J. Wenninger) |
||
MPP-166 |
AOB: all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-165 |
AOB: all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-164 |
AOB: all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-164 |
AOB: Improved abort gap cleaning and shift of first bunch to avoid residual captured beam in the abort gap | ||
MPP-163 |
AOB: Abort Gap Keeper - protection of fine delay parameter - TBC (J. Wenninger, N. Magnin) |
||
MPP-163 |
AOB: all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-162 |
AOB: all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-161 |
AOB: Proposal for machine protection envelope during the Easter WE | lhc-revalidation | |
MPP-161 |
MPS re-commissioning after YETS 2017/18: SIS | lhc-revalidationsis | |
MPP-161 |
AOB: all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-160 |
AOB - all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-159 |
AOB - all | ||
MPP-158 |
AOB: all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-157 |
AOB: all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
2017¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-156 |
AOB: all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-155 |
AOB: all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-154 |
AOB: Intensity cruise checklist | intensity-ramp-up | |
MPP-154 |
AOB: all (D. Wollmann, J. Uythoven, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-153 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-152 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-152 |
AGK and Injection sequencer changes following the first injection of 112b trains 8b4e | ||
MPP-151 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
rMPP | MD 2410 - Beta* levelling | ||
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
|||
MPP-150 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-149 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
60 A PP FGClite new failure cases and mitigation via SIS interlock | sis | ||
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
|||
MPP-148 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-146 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-145 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-144 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-143 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-143 |
SIS: Summary of changes and first ideas for re-commissioning after EYETS | sis | |
MPP-142 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-141 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-140 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-139 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
2016¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-138 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-137 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-136 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-135 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
rMPP | MP considerations of special physics fills | ||
MPP-134 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-133 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-132 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-131 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-130 |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-128 COLLWG |
AOB: Discussion on system validation after technical stop (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette, R. Bruce, S. Redaelli) |
lhc-revalidation | |
MPP-128 COLLWG |
OP observations of orbit | lhc-bpm | |
MPP-128 COLLWG |
AOB - all (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-127 |
Orbit interlocking strategy and interlock values and status of PC Interlock | pc-interlock | |
MPP-127 |
AOB (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-125 |
AOB (D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-124 |
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-123 |
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-122 |
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth, M. Valette) |
||
MPP-121 |
AOB - operational plans of AFP | lhc-xrp | |
MPP-120 |
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth) |
2015¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-119 |
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth) |
||
MPP-118 |
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth) |
||
MPP-117 |
AOB | ||
MPP-116 |
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth) |
||
MPP-115 |
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth) |
||
MPP-114 |
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth) |
||
MPP-113 |
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth) |
||
MPP-112 |
AOB (A. Apollonio, D. Wollmann, J. Wenninger, M. Zerlauth) |
||
MPP-111 |
AOB (A. Lechner, B. Auchmann, J. Wenninger, M. Zerlauth) |
||
Workshop | Experience from operation 2015 | ||
MPP-109 |
AOB (A. Lechner, B. Auchmann, J. Wenninger, M. Zerlauth) |
||
MPP-108 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-107 |
AOB | ||
MPP-106 |
SIS summary of commissioning results | sis | |
MPP-106 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-105 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-105 |
Round table discussion on MPS commissioning status | lhc-revalidation | |
MPP-104 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-103 |
SIS system changes and commissioning | sis | |
MPP-103 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-102 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-101 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-100 |
AOB (J. Wenninger, M. Zerlauth) |
2014¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-99 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-98 |
AOB | ||
MPP-97 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-96 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-95 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-94 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-93 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-92 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-91 |
Protection of ALICE against head on collisions - lumi range, trims and potential mitigations | lumi-levelling | |
MPP-91 |
AOB | ||
MPP-90 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-89 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-88 |
AOB - Update of MPP mandate and Member list | ||
MPP-87 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-86 |
AOB (J. Wenninger, M. Zerlauth) |
||
MPP-85 |
AOB: Short review discussion on SIS Interlocks: obsolete, new and remaining (J. Wenninger, All) | sis |
2013¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-84 |
AOB (D. Wollmann, J. Wenninger, M. Zerlauth, V. Chetvertkova) |
||
MPP-84 |
Update of (Re-)Commissioning procedures for PIC, FMCM, BIS, ... | lhc-revalidation | |
MPP-83 |
AOB (D. Wollmann, J. Wenninger, M. Zerlauth, V. Chetvertkova) |
||
MPP-82 |
AOB (D. Wollmann, J. Wenninger, M. Zerlauth, V. Chetvertkova) |
||
MPP-81 |
AOB (D. Wollmann, J. Wenninger, M. Zerlauth, V. Chetvertkova) |
||
MPP-78 |
TCDI / virtual beta* interlocking | lhc-injection | |
Workshop | Changes in SPS interlocking |
2011¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-48 |
Machine Protection issues & proposal for Pb-p run | ion-run | |
MPP-42 |
Simulations of UFO speed and size | fast-failure | |
MPP-42 |
MPS Aspects of MDs | ||
MPP-39 |
Attempt to measure UFO speeds | fast-failure | |
MPP-39 |
Strategy for handling faulty CODs | powering | |
MPP-39 |
What if the dump does not trigger? | lbds |
2010¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-37 |
AOB: BGI magnets | lhc-instrumentation | |
MPP-35 |
COD and orbit interlocks | lhc-orbit | |
MPP-34 |
AOB | ||
MPP-33 |
Proposal for SBF | smp | |
MPP-32 |
Plan for intensity increase | intensity-ramp-up | |
MPP-32 |
External review outcome | ||
MPP-31 |
News on fast loss BLM events | fast-failure | |
MPP-30 |
Dump triggers by BLMs on cold elements | blm-thresholds | |
MPP-26 |
AOB | ||
MPP-24 |
MPS tests with beam (450 GeV) | lhc-revalidation | |
MPP-24 |
ATLAS dump PM (08.03.2010) | post-mortem | |
MPP-24 |
AOB | ||
MPP-23 |
Intensity increase planning | intensity-ramp-up | |
MPP-22 |
Evian and Chamonix follow up, AOB | ||
MPP-21 |
SIS orbit and corrector interlocking | sislhc-orbit | |
MPP-21 |
IR aperture scan results | lhc-aperture |
2009¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-19 |
SIS for orbit and correctors | sislhc-orbit | |
MPP-19 |
TDI issues | lhc-injection | |
MPP-19 |
BIS configuration for startup - experiments | bis | |
MPP-17 |
AOB : Sector test BIC configuration | bis | |
MPP-15 |
AOB : RF issues | rf | |
MPP-14 |
AOB : busbar quenches, FLUKA for interconnects | ||
MPP-12 |
AOB | ||
MPP-11 |
LMC action (vacuum, failures...) | ||
MPP-10 |
Time estimates for MPS tests with beam | lhc-revalidation | |
MPP-7 |
MPS commissioning phases | lhc-revalidation | |
MPP-7 |
SIS status | sis | |
MPP-7 |
AOB |
2008¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-5 |
AOB : BQM, SPS position interlock | ||
MPP-4 |
SPS interlock modifications for 2009 | sps | |
MPWG | Machine Protection Experience and Issues at the SPS in 2007 | sps |
2007¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Machine considerations and constraints for the Safe Injection Flag and Safe Beam Flag | smp | |
MPWG | AC-dipole | lhc-optics |
2006¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Machine protection for CNGS : commissioning and operation | sps | |
MPWG | Update on Software Interlock System | sis |
2005¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Software Interlock System | sis | |
MPWG | Commissioning of the transfer line interlocks for CNGS & LHC | sps | |
MPWG | Status of interlocking for CNGS | sps | |
MPWG | AOB: transferline interlock issues | ||
MPWG | Chamonix debriefing. |
2004¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | AOB | ||
MPWG | Post-mortem 'analysis' of the interlock system for the TI8/TT40 tests | ||
MPWG | Report from HERA visit on fast beam losses | fast-failure |
2003¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | SPS extraction interlocks : the TED dump case | sps | |
MPWG | SPS interlocks for LHC extraction | sps | |
MPWG | Orbit surveillance and interlocks | sislhc-orbitpc-interlock |
2002¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Orbit feedback in IR6 | lbdslhc-orbit | |
MPWG | Status of the new SPS hardware interlocks | sps |