Skip to content

Past topics

2024

Reference Title Tags Links
MPP-247
COLLWG
Displaced BLMs in IR7 - Thresholds, response, sensitivity and first experience during scrubbing and the intensity ramp-up
(B. Salvachua Ferrando, C. Zamantzas, S. Morales Vigo)
blm-thresholdsblm-ir7
MPP-246
Readiness for first Stable Beams
(A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, F. Van Der Veken, G. Pigny, I. Romera Ramirez, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil)
stable-beams-readiness
MPP-244
Readiness for first beam
(A. Butterworth, B. Salvachua Ferrando, C. Zamantzas, D. Mirarchi, G. Pigny, J. Wenninger, M. Trzebinski, M. Deile, M. Saccani, R. Secondo, Y. Dutheil)
stable-beams-readiness

2023

Reference Title Tags Links
MPP-242
AOB: Installation of additional BLMs and replacement of 6 SEMs by LICs in the collimation region
(B. Salvachua Ferrando, C. Zamantzas)
blm-ir7
rMPP Beam Loss Monitor system
(B. Salvachua Ferrando, C. Zamantzas)

2022

Reference Title Tags Links
MPP-226
Readiness of Machine Protection and related systems for a full machine at injection (scrubbing) and things open before taking a 12 bunch train up to top energy.
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Kotzian, G. Pigny, J. Uythoven, J. Wenninger, M. Trzebinski, M. Deile, M. Soderen, M. Saccani, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness
MPP-223
Status of MP system commissioning before first beam
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Kotzian, G. Pigny, J. Uythoven, J. Wenninger, M. Trzebinski, M. Deile, M. Soderen, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness

2021

Reference Title Tags Links
MPP-214
Status MP system commissioning before first injection of a nominal bunch
(B. Salvachua Ferrando, C. Bracco, C. Zamantzas, D. Wollmann, D. Mirarchi, G. Pigny, J. Uythoven, J. Wenninger, M. Solfaroli Camillocci, R. Secondo, S. Morales Vigo, S. Redaelli, Y. Dutheil)
stable-beams-readiness
MPP-212
Status of BLM testing with TIM and proposal for sub-set of tested BLMs before the pilot beam test
(B. Salvachua Ferrando, C. Zamantzas)
blm-hardware
MPP-207
Re-commissioning of the BLM System
(C. Zamantzas)
blm-hardwareblm-software

2020

Reference Title Tags Links
MPP-200
Overview and architecture
(C. Zamantzas)
pspsblinac4
MPP-192
Introduction BLM related activities during LS2 in the injectors
(C. Zamantzas)
blm-hardwareblm-software

2019

Reference Title Tags Links
Workshop Beam loss monitor system
(C. Zamantzas)

2018

Reference Title Tags Links
MPP-161
MPS re-commissioning after YETS 2017/18: BLM System
(C. Zamantzas)
lhc-revalidationblm-hardware

2017

Reference Title Tags Links
AOB: HV problem at BLMs R3 - observations and possible mitigations - TBC
(C. Zamantzas)
blm-hardware
MPP-144
BLM System: Summary of changes and re-commissioning after EYETS
(C. Zamantzas)
blm-hardwareblm-software

2016

Reference Title Tags Links
Beam Loss Monitors and Diamond detectors: Configurations and interlock logic
(C. Zamantzas, F. Roncarolo)
linac4

2015

Reference Title Tags Links
MPP-118
Review injection BLM interlock inhibit
(C. Zamantzas)
blm-hardwareblm-software
MPP-106
BLM system summary of commissioning results
(B. Dehning, C. Zamantzas)
blm-hardwareblm-software
MPP-105
Round table discussion on MPS commissioning status
(C. Bracco, C. Martin, C. Zamantzas, E. Holzer, E. Holzer, G. Valentino, G. Pigny, I. Romera Ramirez, J. Uythoven, J. Wenninger, M. Zerlauth, S. Gabourin, W. Bartmann)
lhc-revalidation

2014

Reference Title Tags Links
MPP-99
Technical implementation of BLM interlock inhibit during beam injections
(C. Zamantzas)
blm-hardware

2013

Reference Title Tags Links
Workshop Hardware changes in BLM system during LS1
(C. Zamantzas)

2011

Reference Title Tags Links
MPP-55
Changes of BLM system for 2012 run
(C. Zamantzas)
blm-hardwareblm-software
MPP-51
LHC BLM system: possible modification schemes to KEEP or to FORCE true the beam permit signal at injection
(C. Zamantzas)
blm-software
MPP-47
Summary of BLM Review
(C. Zamantzas)
blm-hardwareblm-software

2009

Reference Title Tags Links
MPP-18
BLM results from injection test
(C. Zamantzas)
blm-hardwareblm-software

2006

Reference Title Tags Links
MPWG Beam Loss Monitor electronics and beam dump thresholds
(C. Zamantzas)
blm-hardwareblm-thresholds

2004

Reference Title Tags Links
MPWG LHC Beam Loss Monitors - design of the digitial electronics
(C. Zamantzas)
blm-hardware