Past topics¶
2017¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-145 |
How to safely run with variable AGK (protection of settings, consistency checks with SPS beam preparation) and following changes in injection BIS | agk |
2016¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-131 |
AOB - Follow-up of the reduction of the abort gap keeper window | agk |
2014¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-96 |
Status of (automatic) abort gap cleaning procedure | agk |
2013¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-75 |
Abort gap population measurements in ALICE | agk |
2011¶
| Reference | Title | Tags | Links |
|---|---|---|---|
MPP-55 |
Operational procedure for abort gap cleaning | agk |