2024

Reference Title Tags Links
MPP-253
Update on BBCW status and plans
(A. Rossi)
bbcw
MPP-251
Planned adjustment of the temperature interlock of the BBCW
(A. Rossi)
bbcw
rMPP Temperature interlock
(A. Rossi)
bbcw
rMPP Summary of measurements and WIC event
(G. Sterbini)
bbcw
MPP-246
BBWC commissioning and operation for 2024
(G. Sterbini)
bbcw

2022

Reference Title Tags Links
MPP-224
COLLWG
In-jaw beam-beam wire commissioning procedure and schedule
(A. Rossi)
bbcw

2020

Reference Title Tags Links
MPP-193
BBLR wire compensation feed-forward in Run 3
(A. Poyet)
bbcw
MPP-193
Machine-protection aspects of BBLR operation in Run 3
(A. Rossi)
bbcw

2019

Reference Title Tags Links
MPP-176
LRBB wire: results of failure-case study
(B. Lindstrom)
bbcw

2018

Reference Title Tags Links
MPP-173
Plans of using Beam-Beam Long-Range (BBLR) compensators in B1 and B2 during high intensity operation - impact on interlocking and protection strategy
(A. Rossi)
bbcw
MPP-160
Beam-beam wire collimators (TCTW): new interlocking electronics and proposed commissioning tests for existing and newly installed TCTW
(A. Rossi)
bbcw

2017

Reference Title Tags Links
rMPP MD 2269 - Round Telescopic optics - revalidation and LRBB studies with trains
(S. Fartoukh)
bbcw
MPP-144
AOB: Beam Beam wire compensator: final implementation of wire temperature interlock
(A. Rossi)
bbcw

2016

Reference Title Tags Links
MPP-135
Beam-Beam Wire - report on results of developments for temperature supervision via wire resistance
(A. Rossi)
bbcw
MPP-134
Operational and interlocking strategy for beam-beam wire compensators in IP5 (TCT, TCL)
(A. Rossi)
bbcw

2011

Reference Title Tags Links
MPP-48
LHC Beam Beam Compensator – a first proposal
(R. Steinhagen)
bbcw