2024¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-253 |
Update on BBCW status and plans | bbcw | |
MPP-251 |
Planned adjustment of the temperature interlock of the BBCW | bbcw | |
rMPP | Temperature interlock | bbcw | |
rMPP | Summary of measurements and WIC event (G. Sterbini) |
bbcw | |
MPP-246 |
BBWC commissioning and operation for 2024 | bbcw |
2022¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-224 COLLWG |
In-jaw beam-beam wire commissioning procedure and schedule | bbcw |
2020¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-193 |
BBLR wire compensation feed-forward in Run 3 | bbcw | |
MPP-193 |
Machine-protection aspects of BBLR operation in Run 3 | bbcw |
2019¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-176 |
LRBB wire: results of failure-case study | bbcw |
2018¶
2017¶
2016¶
2011¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-48 |
LHC Beam Beam Compensator – a first proposal | bbcw |