Past topics

2023

Reference Title Tags Links
MPP-242
Implications of the BISv2 design for the LBDS
(N. Voumard, P. Van Trappen)
bislbds
MPP-242
BIS v2 and change of the actuator interface
(I. Romera Ramirez)
bis

2022

Reference Title Tags Links
MPP-227
Risk assessment for change of Linac4 source BIC actuator
(J. Lallement)
linac4bis

2020

Reference Title Tags Links
MPP-197
Conformity of BIS connection
(C. Martin)
bis

2017

Reference Title Tags Links
MPP-142
BIS: Summary of changes and re-commissioning after EYETS
(C. Martin)
lhc-revalidationbis

2016

Reference Title Tags Links
MPP-138
Local BIS loops in LHC point 6
(C. Martin, J. Uythoven)
lbdsbis
MPP-136
AOB: Delay between CIBDS beam permit removal and TSU detection via long BIS path
(S. Gabourin)
bis
MPP-135
Technical specification for CIBDS V2.0
(D. Calcoen, S. Gabourin)
bis
MPP-120
Installation of Cherenkov detector in TT20 (UA9) and connection to SPS-BIS
(S. Montesano)
spsbis

2015

Reference Title Tags Links
MPP-118
AOB - CIBDS beam dump trigger - summary of event and consequences
(S. Gabourin)
bis
MPP-111
Proposed changes in Chopper Master BIC for 50MeV commissioning
(S. Gabourin)
bislinac4
Workshop Beam Interlock System + Safe Machine Parameter System
(S. Gabourin)
bissmp
MPP-106
BIS/SMP summary of commissioning results
(S. Gabourin)
bissmp
MPP-103
BIS /SMP readiness for sector test (SBF generation, new optics IDs, CIBDS spares…)
(S. Gabourin)
bissmp
MPP-101
BIS comissioning in extraction/injection lines
(C. Martin)
bis

2014

Reference Title Tags Links
MPP-98
New link between BIS and LBDS: Experience from LBDS reliability run and CIBDS recap
(S. Gabourin)
lbdsbis
MPP-90
Recommissioning procedures for BIS and SMP
(S. Gabourin)
bissmp
MPP-89
Operational experience with BIS system in LINAC4 and open issues/non-conformities
(C. Martin)
linac4bis
MPP-88
Changes in BIS and SMP for run2
(S. Gabourin)
bissmp
MPP-85
Update of (Re-)Commissioning procedures for PIC, FMCM, BIS, ...
(I. Romera Ramirez)
picfmcmbis

2013

Reference Title Tags Links
MPP-80
Machine Protection Considerations to Linac4 BIS commissioning
(A. Apollonio)
bislinac4
MPP-79
Dependability analysis of redundant BIS-LBDS trigger channel
(A. Apollonio, V. Vatansever)
bislbds
MPP-79
Proposed implementation of redundant BIS-LBDS trigger channel
(S. Gabourin)
bislbds

2012

Reference Title Tags Links
MPP-72
Redundant channel for triggering of LBDS
(S. Gabourin)
lbdsbis

2010

Reference Title Tags Links
MPP-37
BIS re-commissioning and changes for 2011
(B. Puccio)
bis

2009

Reference Title Tags Links
MPP-19
External review of the BIS
(B. Todd)
bis
MPP-19
BIS configuration for startup - experiments
(J. Wenninger)
bis
MPP-17
AOB : Sector test BIC configuration
(J. Wenninger)
bis

2008

Reference Title Tags Links
MPP-6
CIBU connection review
(B. Todd, B. Puccio)
bis

2006

Reference Title Tags Links
MPWG Summary of the BIS Audit
(S. Lueders, S. Lueders)
bis
MPWG Introduction to the BIS Audit
(R. Schmidt)
bis
MPWG Results of EMC tests for Beam Interlock System hardware
(B. Todd)
bis
MPWG Interface between the Cryogenic System and the Powering and Beam Interlock System
(L. Serio)
picbis

2005

Reference Title Tags Links
MPWG Commissioning of the beam interlock system
(B. Todd)
bis
MPWG Realisation of the interlocking between SPS, LHC and CNGS and open issues
(B. Puccio)
spsbis
MPWG Specification for interlocking between SPS, LHC and CNGS
(B. Goddard)
spsbis
MPWG Reliability of the interlock system
(B. Todd)
bis

2004

Reference Title Tags Links
MPWG Specification of the Beam Interlock System
(B. Puccio)
bis

2003

Reference Title Tags Links
MPWG Interfaces BIC-clients
(B. Puccio)
bis
MPWG Beam Interlock Controller
bis
MPWG Beam Interlock Controller interface
(B. Puccio)
bis

2002

Reference Title Tags Links
MPWG Evaluation of a Fast PLC Module for the Beam Interlock System
(M. Zaera Sanz)
bis
MPWG Interfaces between Power and Beam Interlock Controllers and other systems
(R. Schmidt)
bispic