Past topics¶
2023¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-242 |
Implications of the BISv2 design for the LBDS | bislbds | |
MPP-242 |
BIS v2 and change of the actuator interface | bis |
2022¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-227 |
Risk assessment for change of Linac4 source BIC actuator | linac4bis |
2020¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-197 |
Conformity of BIS connection | bis |
2017¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-142 |
BIS: Summary of changes and re-commissioning after EYETS | lhc-revalidationbis |
2016¶
2015¶
2014¶
2013¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-80 |
Machine Protection Considerations to Linac4 BIS commissioning | bislinac4 | |
MPP-79 |
Dependability analysis of redundant BIS-LBDS trigger channel | bislbds | |
MPP-79 |
Proposed implementation of redundant BIS-LBDS trigger channel | bislbds |
2012¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-72 |
Redundant channel for triggering of LBDS | lbdsbis |
2010¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-37 |
BIS re-commissioning and changes for 2011 | bis |
2009¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-19 |
External review of the BIS | bis | |
MPP-19 |
BIS configuration for startup - experiments | bis | |
MPP-17 |
AOB : Sector test BIC configuration | bis |
2008¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-6 |
CIBU connection review | bis |
2006¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Summary of the BIS Audit | bis | |
MPWG | Introduction to the BIS Audit | bis | |
MPWG | Results of EMC tests for Beam Interlock System hardware | bis | |
MPWG | Interface between the Cryogenic System and the Powering and Beam Interlock System | picbis |
2005¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Commissioning of the beam interlock system | bis | |
MPWG | Realisation of the interlocking between SPS, LHC and CNGS and open issues | spsbis | |
MPWG | Specification for interlocking between SPS, LHC and CNGS | spsbis | |
MPWG | Reliability of the interlock system | bis |
2004¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Specification of the Beam Interlock System | bis |
2003¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Interfaces BIC-clients | bis | |
MPWG | Beam Interlock Controller |
bis | |
MPWG | Beam Interlock Controller interface | bis |
2002¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Evaluation of a Fast PLC Module for the Beam Interlock System | bis | |
MPWG | Interfaces between Power and Beam Interlock Controllers and other systems | bispic |