Skip to content

Past topics

2023

Reference Title Tags Links
MPP-238
LHC BLM firmware update during TS1
(M. Saccani)
blm-hardware

2021

Reference Title Tags Links
MPP-212
Status of BLM testing with TIM and proposal for sub-set of tested BLMs before the pilot beam test
(B. Salvachua Ferrando, C. Zamantzas)
blm-hardware
MPP-207
BLM System: Summary of the major installation changes & TIM development
(B. Salvachua Ferrando)
blm-hardwareblm-software
MPP-207
Re-commissioning of the BLM System
(C. Zamantzas)
blm-hardwareblm-software

2020

Reference Title Tags Links
MPP-192
BLM hardware changes at SPS
(E. Effinger)
blm-hardware
MPP-192
Introduction BLM related activities during LS2 in the injectors
(C. Zamantzas)
blm-hardwareblm-software

2018

Reference Title Tags Links
MPP-161
MPS re-commissioning after YETS 2017/18: BLM System
(C. Zamantzas)
lhc-revalidationblm-hardware

2017

Reference Title Tags Links
MPP-151
AOB: Following de-activation of SEMs in dump region, mid-term approach for loss detection in dump region and longterm vision for replacement
(N. Magnin, W. Bartmann)
blm-hardwarelbds
AOB: HV problem at BLMs R3 - observations and possible mitigations - TBC
(C. Zamantzas)
blm-hardware
MPP-144
BLM System: Summary of changes and re-commissioning after EYETS
(C. Zamantzas)
blm-hardwareblm-software

2015

Reference Title Tags Links
MPP-118
Review injection BLM interlock inhibit
(C. Zamantzas)
blm-hardwareblm-software
MPP-115
Results of Direct BLM tests and proposed linking to correct beam
(C. Xu)
blm-hardwarelbds
MPP-113
Results of BLM filter verification
(M. Kalliokoski)
blm-hardware
MPP-112
Direct BLM interlock tests
(E. Holzer)
lbdsblm-hardware
Workshop Beam loss monitoring
(B. Dehning)
blm-hardwareblm-software
MPP-108
AOB2 - BLM HV issue in IP6: first results on cause, consequences and risks
(B. Dehning)
blm-hardware
MPP-106
BLM system summary of commissioning results
(B. Dehning, C. Zamantzas)
blm-hardwareblm-software

2014

Reference Title Tags Links
MPP-99
ECR for injection BLMs
(E. Holzer, E. Holzer)
blm-hardware
MPP-99
Technical implementation of BLM interlock inhibit during beam injections
(C. Zamantzas)
blm-hardware

2013

Reference Title Tags Links
MPP-81
Implication on HV performance and tests foreseen
(V. Senaj)
blm-hardware
MPP-77
Injection region BLMs – left IP2: Suggestion of changes
(E. Holzer, E. Holzer)
blm-hardwareblm-software
MPP-77
LICs: Summary of experimental results
(E. Nebot Del Busto)
blm-hardware

2012

Reference Title Tags Links
MPP-73
Modification of HV interlock of BLM to allow for 200kW losses
(E. Effinger)
blm-hardware
MPP-70
Study of the response of Ionization Chambers in HiRadMat
(E. Nebot Del Busto)
blm-hardware
MPP-69
Update on interlock BPMs in IR6
(E. Calvo)
blm-hardware
MPP-69
Proposed change of BLM positions in the arcs during LS1
(M. Sapinski)
blm-hardware
MPP-68
Cryogenic BLMs
(C. Kurfuerst, C. Kurfuerst)
blm-hardware
MPP-63
Changes proposed for interlocked BPMS in IR6 during TS2
(E. Calvo)
blm-hardware
MPP-60
Performance of LIC detectors in the LHC and planned replacement of SEMs by LICs for certain areas
(E. Nebot Del Busto)
blm-hardware
MPP-60
BLM-HV: Mitigation strategies to overcome the dropping due to losses in the IR7 collimation region and it's impact on operational efficiency
(E. Nebot Del Busto)
blm-hardware

2011

Reference Title Tags Links
MPP-55
Changes of BLM system for 2012 run
(C. Zamantzas)
blm-hardwareblm-software
MPP-52
BLM electronics failure mode cases for the selected proposal on LHCBLM sunglasses
(J. Emery)
blm-hardware
MPP-52
Limiting BLM monitors – What could be gained without sunglasses
(E. Holzer, E. Holzer)
blm-hardware
MPP-52
List for Sunglass BLMs
(W. Bartmann)
blm-hardware
MPP-51
List for Sunglass BLMs
(W. Bartmann)
blm-hardware
MPP-47
Summary of BLM Review
(C. Zamantzas)
blm-hardwareblm-software

2010

Reference Title Tags Links
MPP-37
BLM system re-commissioning and changes for 2011
(B. Dehning)
blm-hardwareblm-software
MPP-28
BLM high voltage observations
(A. Nordt)
blm-hardware
MPP-22
Proposed changes to BLM system
(E. Holzer, E. Holzer)
blm-softwareblm-hardware

2009

Reference Title Tags Links
MPP-19
BLMs for startup
(B. Dehning)
blm-hardware
MPP-18
BLM results from injection test
(C. Zamantzas)
blm-hardwareblm-software
MPP-15
BLM system status and plans
(B. Dehning)
blm-hardwareblm-software
MPP-15
BLMs for empty cryostat
(E. Holzer, E. Holzer)
blm-hardware
MPP-10
BLM specification comments
(E. Holzer, E. Holzer)
blm-hardwareblm-software

2008

Reference Title Tags Links
MPP-5
BLM status
(B. Dehning)
blm-hardware
MPP-2
Status of BLMs
(B. Dehning)
blm-hardware

2007

Reference Title Tags Links
MPWG Measurements and Simulations for the LHC BLM System at the HERA Proton Beam Dump
(M. Stockner)
blm-hardware

2006

Reference Title Tags Links
MPWG Beam Loss Monitor electronics and beam dump thresholds
(C. Zamantzas)
blm-hardwareblm-thresholds
MPWG Positioning of LHC BLMs
(L. Ponce)
blm-hardware

2005

Reference Title Tags Links
MPWG Individual BLM input to the LBDS
(B. Goddard)
blm-hardwarelbds
MPWG Possible staging of the BLM system: questions from the BDI group to the MPWG
(B. Dehning)
blm-hardware

2004

Reference Title Tags Links
MPWG BLM interlock follow up
(B. Dehning)
blm-hardware
MPWG LHC Beam Loss Monitors - design of the digitial electronics
(C. Zamantzas)
blm-hardware
MPWG Radiation dose monitors for the LHC
(T. Wijnands, T. Wijnands)
blm-hardware
MPWG Location of beam loss monitors
(E. Holzer, E. Holzer)
blm-hardware

2003

Reference Title Tags Links
MPWG Beam Loss Monitor system availability
(G. Guaglio)
blm-hardware

2002

Reference Title Tags Links
MPWG Design of the LHC Beam Loss Monitor
(E. Gschwendtner)
blm-hardware
MPWG Specifications of the LHC Beam Loss Monitors
(B. Jeanneret)
blm-hardware