Past topics¶
2023¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-238 |
LHC BLM firmware update during TS1 | blm-hardware |
2021¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-212 |
Status of BLM testing with TIM and proposal for sub-set of tested BLMs before the pilot beam test | blm-hardware | |
MPP-207 |
BLM System: Summary of the major installation changes & TIM development | blm-hardwareblm-software | |
MPP-207 |
Re-commissioning of the BLM System | blm-hardwareblm-software |
2020¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-192 |
BLM hardware changes at SPS | blm-hardware | |
MPP-192 |
Introduction BLM related activities during LS2 in the injectors | blm-hardwareblm-software |
2018¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-161 |
MPS re-commissioning after YETS 2017/18: BLM System | lhc-revalidationblm-hardware |
2017¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-151 |
AOB: Following de-activation of SEMs in dump region, mid-term approach for loss detection in dump region and longterm vision for replacement | blm-hardwarelbds | |
AOB: HV problem at BLMs R3 - observations and possible mitigations - TBC | blm-hardware | ||
MPP-144 |
BLM System: Summary of changes and re-commissioning after EYETS | blm-hardwareblm-software |
2015¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-118 |
Review injection BLM interlock inhibit | blm-hardwareblm-software | |
MPP-115 |
Results of Direct BLM tests and proposed linking to correct beam | blm-hardwarelbds | |
MPP-113 |
Results of BLM filter verification | blm-hardware | |
MPP-112 |
Direct BLM interlock tests | lbdsblm-hardware | |
Workshop | Beam loss monitoring | blm-hardwareblm-software | |
MPP-108 |
AOB2 - BLM HV issue in IP6: first results on cause, consequences and risks | blm-hardware | |
MPP-106 |
BLM system summary of commissioning results (B. Dehning, C. Zamantzas) |
blm-hardwareblm-software |
2014¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-99 |
ECR for injection BLMs | blm-hardware | |
MPP-99 |
Technical implementation of BLM interlock inhibit during beam injections | blm-hardware |
2013¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-81 |
Implication on HV performance and tests foreseen | blm-hardware | |
MPP-77 |
Injection region BLMs – left IP2: Suggestion of changes | blm-hardwareblm-software | |
MPP-77 |
LICs: Summary of experimental results | blm-hardware |
2012¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-73 |
Modification of HV interlock of BLM to allow for 200kW losses | blm-hardware | |
MPP-70 |
Study of the response of Ionization Chambers in HiRadMat | blm-hardware | |
MPP-69 |
Update on interlock BPMs in IR6 | blm-hardware | |
MPP-69 |
Proposed change of BLM positions in the arcs during LS1 | blm-hardware | |
MPP-68 |
Cryogenic BLMs | blm-hardware | |
MPP-63 |
Changes proposed for interlocked BPMS in IR6 during TS2 | blm-hardware | |
MPP-60 |
Performance of LIC detectors in the LHC and planned replacement of SEMs by LICs for certain areas | blm-hardware | |
MPP-60 |
BLM-HV: Mitigation strategies to overcome the dropping due to losses in the IR7 collimation region and it's impact on operational efficiency | blm-hardware |
2011¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-55 |
Changes of BLM system for 2012 run | blm-hardwareblm-software | |
MPP-52 |
BLM electronics failure mode cases for the selected proposal on LHCBLM sunglasses | blm-hardware | |
MPP-52 |
Limiting BLM monitors – What could be gained without sunglasses | blm-hardware | |
MPP-52 |
List for Sunglass BLMs | blm-hardware | |
MPP-51 |
List for Sunglass BLMs | blm-hardware | |
MPP-47 |
Summary of BLM Review | blm-hardwareblm-software |
2010¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-37 |
BLM system re-commissioning and changes for 2011 | blm-hardwareblm-software | |
MPP-28 |
BLM high voltage observations | blm-hardware | |
MPP-22 |
Proposed changes to BLM system | blm-softwareblm-hardware |
2009¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-19 |
BLMs for startup | blm-hardware | |
MPP-18 |
BLM results from injection test | blm-hardwareblm-software | |
MPP-15 |
BLM system status and plans | blm-hardwareblm-software | |
MPP-15 |
BLMs for empty cryostat | blm-hardware | |
MPP-10 |
BLM specification comments | blm-hardwareblm-software |
2008¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-5 |
BLM status | blm-hardware | |
MPP-2 |
Status of BLMs | blm-hardware |
2007¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Measurements and Simulations for the LHC BLM System at the HERA Proton Beam Dump | blm-hardware |
2006¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Beam Loss Monitor electronics and beam dump thresholds | blm-hardwareblm-thresholds | |
MPWG | Positioning of LHC BLMs | blm-hardware |
2005¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Individual BLM input to the LBDS | blm-hardwarelbds | |
MPWG | Possible staging of the BLM system: questions from the BDI group to the MPWG (B. Dehning) |
blm-hardware |
2004¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | BLM interlock follow up | blm-hardware | |
MPWG | LHC Beam Loss Monitors - design of the digitial electronics | blm-hardware | |
MPWG | Radiation dose monitors for the LHC | blm-hardware | |
MPWG | Location of beam loss monitors | blm-hardware |
2003¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Beam Loss Monitor system availability | blm-hardware |
2002¶
Reference | Title | Tags | Links |
---|---|---|---|
MPWG | Design of the LHC Beam Loss Monitor | blm-hardware | |
MPWG | Specifications of the LHC Beam Loss Monitors | blm-hardware |