MPP-170
SPS-CC: plans for the October MDs, additional interlocks etc.
(L. Carver, R. Calaga)
crab-cavities
MPP-170
Update on machine protection requirements for high intensity operation with CC in the SPS
(D. Wollmann)
crab-cavities
MPP-166
Experience with crab cavities during first set of MDs, status of low level RF and (fast) interlocks
(R. Calaga)
crab-cavities
MPP-166
Observed and tested failure cases of CC in SPS - time scales and criticality
(B. Lindstrom)
crab-cavities
MPP-166
Machine protection requirements for crab cavity MDs with unsafe beam intensities
(D. Wollmann, M. Zerlauth)
crab-cavities
MPP-164
SPS crab cavity test stand - results of interlock test and readiness for taking beam
(G. Vandoni)
crab-cavities

2017

Reference Title Tags Links
MPP-154
SPS crab cavity failures cases and their severity
(M. Valette)
crab-cavities
MPP-153
SPS CC: Final plan for interlocking of crab cavities in SPS
(G. Vandoni)
crab-cavities

2016

Reference Title Tags Links
MPP-137
Foreseen interlocks for the operation of crab cavities in SPS (MD and fixed target)
(G. Vandoni)
crab-cavities

2013

Reference Title Tags Links
MPP-84
Machine protection for CC Test in SPS
(M. Zerlauth)
crab-cavities
MPP-82
SixTrack studies for Crab Cavity Failures in HL-LHC
(B. Yee Rendon)
crab-cavities

2012

Reference Title Tags Links
MPP-61
Studies on crab cavity failure scenarios for HL-LHC
(T. Baer)
crab-cavities
MPP-59
Crab cavities - failures
(R. Calaga, R. Calaga)