Past topics¶
2018¶
2017¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-154 |
SPS crab cavity failures cases and their severity | crab-cavities | |
MPP-153 |
SPS CC: Final plan for interlocking of crab cavities in SPS | crab-cavities |
2016¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-137 |
Foreseen interlocks for the operation of crab cavities in SPS (MD and fixed target) | crab-cavities |
2013¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-84 |
Machine protection for CC Test in SPS | crab-cavities | |
MPP-82 |
SixTrack studies for Crab Cavity Failures in HL-LHC | crab-cavities |
2012¶
Reference | Title | Tags | Links |
---|---|---|---|
MPP-61 |
Studies on crab cavity failure scenarios for HL-LHC | crab-cavities | |
MPP-59 |
Crab cavities - failures | crab-cavities |